Laserfiche WebLink
<br />Mr. Don Pennell <br />City of La Porte <br />September 9,2010 <br />Page 4 <br /> <br />EXTRA SERVICES <br />(not to exceed without additional authorization by the City) <br /> <br />Extra Service item compensation would be as follows: <br /> <br /> Service Basis of Compensation <br />a. Surveying Invoice plus ten percent <br /> service charge <br />b. Record Direct labor cost times <br /> Drawings multiplier <br /> <br />Estimated Cost <br /> <br />$ 25,000.00 <br /> <br />$ 500.00 <br /> <br />Total Extra Services Estimated Cost <br /> <br />$ 25,500.00 <br /> <br />All direct labor costs (hourly charges) will be supported with copies of time sheets signed <br />by the employee and his supervisor. <br /> <br />SCHEDULE <br /> <br />LJA Engineering and Surveying Inc. is prepared to begin work as soon as authorized and proceed <br />with the work in conjunction with the City's schedule. The preliminary and design phases can be <br />undertaken concurrently. A draft of the proposed project will be provided to City staff for review <br />comment within 30 calendar days of receipt of the field surveys and locations of services. The final <br />project can be provided within 30 days of receipt of review comments. <br /> <br />LJA Engineering and Surveying Inc. appreciates the opportunity to prepare this assignment letter <br />for the City. Should you have any questions, please advise. <br /> <br />Very truly yours, <br /> <br />~ ~ ~tll1.l <br /> <br />Charles W. Beere, P.E. <br />Senior Project Manager <br />