My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2010-10-11
LaPorte
>
.Minutes
>
City Council
>
2010's
>
2010
>
2010-10-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:25 PM
Creation date
7/31/2025 11:13:33 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
10/11/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Mr. Don Pennell <br />City of La Porte <br />September 9,2010 <br />Page 4 <br /> <br />EXTRA SERVICES <br />(not to exceed without additional authorization by the City) <br /> <br />Extra Service item compensation would be as follows: <br /> <br /> Service Basis of Compensation <br />a. Surveying Invoice plus ten percent <br /> service charge <br />b. Record Direct labor cost times <br /> Drawings multiplier <br /> <br />Estimated Cost <br /> <br />$ 25,000.00 <br /> <br />$ 500.00 <br /> <br />Total Extra Services Estimated Cost <br /> <br />$ 25,500.00 <br /> <br />All direct labor costs (hourly charges) will be supported with copies of time sheets signed <br />by the employee and his supervisor. <br /> <br />SCHEDULE <br /> <br />LJA Engineering and Surveying Inc. is prepared to begin work as soon as authorized and proceed <br />with the work in conjunction with the City's schedule. The preliminary and design phases can be <br />undertaken concurrently. A draft of the proposed project will be provided to City staff for review <br />comment within 30 calendar days of receipt of the field surveys and locations of services. The final <br />project can be provided within 30 days of receipt of review comments. <br /> <br />LJA Engineering and Surveying Inc. appreciates the opportunity to prepare this assignment letter <br />for the City. Should you have any questions, please advise. <br /> <br />Very truly yours, <br /> <br />~ ~ ~tll1.l <br /> <br />Charles W. Beere, P.E. <br />Senior Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.