Laserfiche WebLink
<br />fiR I ~~~~ER <br /> <br />September 13,2010 <br /> <br />Mr. Don Pannell <br />City of La Porte <br />P.O. Box 1115 <br />La Porte, TX 77572 <br /> <br />Re: 25th Street Water Plant Improvements <br />City of La Porte <br />HDR/C&M Job. No. 10-031 <br /> <br />Dear Mr. Pannell: <br /> <br />Bids were opened on September 9, 2010 for the above-referenced project. Three bids <br />were received for the project. The following is a summary of our bid evaluation: <br /> <br />1. Bid Tabulation Sheet - The bids received for the project are as follows: <br /> <br />Contractor <br /> <br />Total Base Bid <br /> <br />R & B Group, Ine. <br />W.W. Payton Corp. <br />Gemini Contracting <br /> <br />$ 388,500.00 <br />$ 410,000.00 <br />$ 443,500.00 <br /> <br />A copy of the bid tabulation for this project is attached. R & B Group, Inc. is the low <br />bidder on the Bid. Each bid was checked for mathematical errors and/or bid irregularities. <br /> <br />R & B Group, Inc. has worked for HDRjClaunch & Miller (HDR/C&M) in the past, and <br />we have had excellent results with them. R & B Group, Inc has an excellent reputation <br />and we believe that they are capable of doing a good job on this project. <br /> <br />Based on this information, HDRIC&M recommends that the City of La Porte award the <br />25th Street Water Plant Improvements Project to R & B Group, Inc. <br /> <br />NDR Engineering. Inc. <br />Tex.. Registered Englne.rlnl FiJln F.754 <br /> <br />4835 Soulhwesl Fr.ewlY <br />Suite 1'000 <br />Houston, TX TroZHI39 <br /> <br />Phone: (7131622.9214 <br />F..~ 17131822-9285 <br />_hdrinc.com <br />