My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2010-7-12
LaPorte
>
.Minutes
>
City Council
>
2010's
>
2010
>
2010-7-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:25 PM
Creation date
7/31/2025 11:15:23 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/12/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CITY COUNCIL DRAINAGE REPORT <br />July 12,2010 <br /> <br />Klotz Design and Contract Construction <br /> <br />. Design of Sheet Flow Relief Structure Improvements to Creekmont. Fairmont <br />Park West. Brookglen and Fairmont Park East. Only one bid received. Bid <br />rejected - over budget. Bidders contacted to determine concerns - plans and <br />specifications under revision to address concerns. Expect to rebid in late July or <br />early August. <br /> <br />. Drainage Study of Brookglen. Design is 90% complete. Awaiting comments <br />from HCFCD to make any necessary revisions. Expect to bid this Project in Late <br />July or early August. <br /> <br />· Fairmont Park East - Fleetwood Drive. Design is 90% complete. Model runs for <br />5, 10, 25 and 100 year storm events presented to the Drainage and Flooding <br />Committee on June 28th, along with cost estimates for additional paving not <br />included in original proposal. The Committee directed staff to proceed with <br />design. Expect to bid this Project in August. <br /> <br />In-House Design and Construction of City-initiated Proiects. <br /> <br />· South La Porte Bay Outfalls. Oakhurst - Tentative schedule for bidding IS <br />August, subject to funding by the state. <br /> <br />· F-216 Regional Detention Proiect. Clearing of F-216 regional detention is still <br />approximately 60% complete. TxDOT has advised that the fill from this Project <br />is not meeting specification for use in the Wharton Weems Overpass Project. At <br />this time, excavation has been halted until TxDOT determines if the fill can <br />continue to be used. Corps of Engineers permit is being drafted - receipt is <br />expected soon. <br /> <br />· City- Wide De-silting of Major Channels - Staff has identified several major <br />channels not currently maintained by flood Control for possible de-silting. These <br />include B106-05, Arizona from E Street to Park, South 3rd Street from Fairmont <br />Parkway to the WWTP and several side channels off South 8th. Survey is 80% <br />complete. Design of improvements is complete and under review by staff. <br />Expect to bid in August. <br />
The URL can be used to link to this page
Your browser does not support the video tag.