My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2010-7-12
LaPorte
>
.Minutes
>
City Council
>
2010's
>
2010
>
2010-7-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:25 PM
Creation date
7/31/2025 11:15:23 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/12/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. Coordination with Harris County Flood Control District. - HCFCD has <br />completed the F 101 de-silting. Scope of work was drastically reduced for original <br />proposal. Harris County Precinct 2 is investigating why this project was reduced. <br /> <br />In-House Drainage Maintenance Activities. <br /> <br />. North and South Shady Lane. City has received the signed easement for North <br />Shady Lane. Minor design changes are underway to accommodate waterline <br />conflict. Expect to receive quotes in late July or early August.. <br /> <br />Survey and design is complete to provide sheet flow in lieu of underground <br />drainage on Broadway and Sunrise into the Bayport Channel. Project is under <br />review by the Port of Houston and Exxon Pipeline. <br /> <br />. In-Fill Drainage. Cleaned ditches in various areas of the city. Currently <br />concentrating in the area on South ih and South 8th. This area will be completed <br />this month. Crews also addressed several isolated problems in the Spenwick area. <br />Additional work will resume in Spenwick after completion of South 8th Street. <br /> <br />Civil Concepts, a survey firm, has been contracted to perform elevation and <br />topographical survey of South 8th Street, East Main and North and South 16th <br />Streets. Survey completed on South 8th - improvements under design. Survey <br />underway on East Main.. <br /> <br />· Total Drainage Maintenance Completed This Period <br /> <br />o Cleaning of Ditches 10,729 LF <br />o Cleaning of Culverts 0 LF <br />o Resetting Culverts 350 LF <br />
The URL can be used to link to this page
Your browser does not support the video tag.