Laserfiche WebLink
<br />. Coordination with Harris County Flood Control District. - HCFCD has <br />completed the F 101 de-silting. Scope of work was drastically reduced for original <br />proposal. Harris County Precinct 2 is investigating why this project was reduced. <br /> <br />In-House Drainage Maintenance Activities. <br /> <br />. North and South Shady Lane. City has received the signed easement for North <br />Shady Lane. Minor design changes are underway to accommodate waterline <br />conflict. Expect to receive quotes in late July or early August.. <br /> <br />Survey and design is complete to provide sheet flow in lieu of underground <br />drainage on Broadway and Sunrise into the Bayport Channel. Project is under <br />review by the Port of Houston and Exxon Pipeline. <br /> <br />. In-Fill Drainage. Cleaned ditches in various areas of the city. Currently <br />concentrating in the area on South ih and South 8th. This area will be completed <br />this month. Crews also addressed several isolated problems in the Spenwick area. <br />Additional work will resume in Spenwick after completion of South 8th Street. <br /> <br />Civil Concepts, a survey firm, has been contracted to perform elevation and <br />topographical survey of South 8th Street, East Main and North and South 16th <br />Streets. Survey completed on South 8th - improvements under design. Survey <br />underway on East Main.. <br /> <br />· Total Drainage Maintenance Completed This Period <br /> <br />o Cleaning of Ditches 10,729 LF <br />o Cleaning of Culverts 0 LF <br />o Resetting Culverts 350 LF <br />