Laserfiche WebLink
<br />k lot z 4~~ ass 0 cia t e s <br /> <br />APPENDIX A <br /> <br />SOURCE DATA REPORTS AND REFERENCES <br /> <br />City of La Porte Master Drainage Plan (December 1982, O'Malley & Clay, Inc.) <br /> <br />Master Drainage Plan and Interim Improvement Recommendations for Unit FlOl-OO-OO <br />(September 1987, Landev Engineers, Inc.) <br />Clear Creek Watershed Regional Control Plan (February 1992, Dannenbaum Engineering Co.) <br /> <br />Hydrologic and Hydraulic Study for Interconnect of HCFC Unit Bl12-02-00 to Unit Bl09-00-00 <br />and HCFC Regional Detention Site Unit B5l2-0l-00 (April 1997, Wilbur Smith <br />Associates, Consulting Engineers and Planners) <br /> <br />Hydraulic Analysis for Little Cedar Bayou Watershed HCFCD Unit F2l6-00-00 (January 2000, <br />Binkley & Barfield, Inc. Consulting Engineers) <br /> <br />Hydrologic and Hydraulic Analysis of proposed Channel Improvements to Fairmont Ditch <br />(Bl12-05-00) (January 1989, Dodson & Associates, Inc.) <br /> <br />Master Drainage Plan For The City of La Porte (July 1977, Espey, Huston & Associates, Inc. <br />Engineering & Environmental consultants) <br /> <br />Master Drainage Plan Harris County Flood Control District Unit FlOl-OO-OO (September 1987, <br />Landev Engineers, Inc.) <br /> <br />Clear Creek Regional Drainage Plan (July 1989, Dannenbaum Engineering Co.) <br /> <br />Regional Flood Control Plan for Tributaries to Armand Bayou (May 1999, Klotz Associates, <br />Inc.) <br /> <br />City of La Porte Comprehensive Plan (ApriI1984, Vernon G. Hemy & Associates, Inc.) <br /> <br />Taylor Bayou Watershed Master Drainage Plan; Tax Increment Reinvestment Zone #1 (August <br />2003, CivilTech Engineering, Inc.) <br /> <br />Klotz Associates Project No. 0127.008.000 <br />January 2009 <br /> <br />Appendix A-I <br /> <br />La Porte Citywide Drainage Study <br />City of La Porte <br />