My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-13-08 Drainage and Flooding Committee minutes
LaPorte
>
.Minutes
>
Drainage and Flooding Committee
>
2008
>
10-13-08 Drainage and Flooding Committee minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
7/31/2025 11:18:23 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
10/13/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />k lot z 4~~ ass 0 cia t e 5 <br /> <br />Tropical Storm Allison Recovery Project LiDAR QA/QC Galveston Bay, Spring Gully/Goose <br />Creek, Luce Bayou, Cedatr Bayou & Armand Bayou (Brown & Gay Engineers, Inc.) <br /> <br />Hydraulic Analysis for Sens Road From 300' North of Spencer HWY. to 300' North of Avenue <br />"H" HCPID Pin CI/I02/1002/005 VOL 2 (December 2003, Binkley & Barfield, Inc. <br />Consulting Engineers) <br /> <br />Driftwood Drive Drainage Study, City of La Porte Pond to Park Project (June 2004, CivilTech <br />Engineering, Inc.) <br /> <br />Preliminary Analysis for F216-00-00 Linear Detention (November 2004, Binkley & Barfield, <br />Inc. Consulting Engineers) <br /> <br />Drainage Report - Impact and Mitigation Analysis San Jacinto and Galveston Bay Watershed; <br />Proposed Fairmont Parkway Improvements From 16th Street to State HW 146 (December <br />2005, TSC Engineering Company) <br /> <br />Hydraulic Analysis for Sens Road From 300' North of Spencer HWY. to 300' North of Avenue <br />"H" HCPID Pin CI/I02/1002/005; Little Cedar Bayou (F216-00-00) & HCFCD <br />Channel Al 04-07-00 (February 2005, Binkley & Barfield, Inc. Consulting Engineers) <br /> <br />Hydrologic & Hydraulic Analysis Port Crossing Development (June 2006, Goldston Engineering, <br />Inc.) <br /> <br />Appendix A-2 <br /> <br />Klotz Associates Project No. 0127.008.000 <br />January 2009 <br /> <br />La Porte Citywide Drainage Study <br />City of La Porte <br />
The URL can be used to link to this page
Your browser does not support the video tag.