Laserfiche WebLink
Alternative 1 <br />Add Parallel Storm Trunk Under NB Fleetwood Drive (2,950 LF) <br />from Outfall to N. Sycamore & Replace Northbound Pavement <br />Table 1 <br />Item <br />No. <br />Item Description <br />Unit <br />Estimated <br />Quantity <br />Unit Price <br />Total Cost <br />1 <br />Mobilize & Prepare ROW <br />LS <br />1 <br />$ 10,000.00 <br />$ 10,000.00 <br />2 <br />Remove & Dispose of Existing Pavement on One <br />Side <br />SY <br />3,933 <br />$ 3.00 <br />$ 11,800.00 <br />3 <br />Remove & Dispose of Existing 60" CMP <br />LF <br />155 <br />$ 16.00 <br />$ 2,480.00 <br />4 <br />Excavation <br />CY <br />3,824 <br />$ 4.60 <br />$ 17,600.00 <br />5 <br />7" Reinforced Concrete Pavement (Include <br />Subgrade) <br />SY <br />3,933 <br />$ 40.00 <br />$ 157,340.00 <br />6 <br />Inlets Types A, B, C <br />EA <br />22 <br />$ 2,233.33 <br />$ 49,140.00 <br />7 <br />24" Reinforced Concrete Pipe <br />LF <br />330 <br />$ 60.00 <br />$ 19,800.00 <br />8 <br />36" Reinforced Concrete Pipe <br />LF <br />541 <br />$ 75.00 <br />$ 40,580.00 <br />9 <br />48" Reinforced Concrete Pipe <br />LF <br />236 <br />$ 100.00 <br />$ 23,600.00 <br />10 <br />54" Reinforced Concrete Pipe <br />LF <br />310 <br />$ 125.00 <br />$ 38,750.00 <br />11 <br />60" Reinforced Concrete Pipe <br />LF <br />556 <br />$ 250.00 <br />$ 139,000.00', <br />12 <br />5' x 5' Reinforced Concrete Box <br />LF <br />291 <br />$ 145.00 <br />$ 42,200.00' <br />13 <br />6' x 5' Reinforced Concrete Box <br />LF <br />823 <br />$ 170.00 <br />$ 139,910.00' <br />14 <br />8' x 6' Reinforced Concrete Box <br />LF <br />205 <br />$ 400.00 <br />$ 82,000.00 <br />15 <br />Junction Box <br />EA <br />1 <br />$ 10,000.00 <br />$ 10,000.00 <br />16 <br />Manholes <br />Fro <br />10 <br />$ 3,000.00 <br />$ 30,000.00 <br />17 <br />Wingwall with Headwall <br />EA <br />1 <br />$ 25,000.00 <br />$ 25,000.00 <br />18 <br />5" Concrete Riprap <br />SY <br />75 <br />$ 42.00 <br />$ 3,150.00 <br />19 <br />Cement Stabilized Sand <br />Ton <br />879 <br />$ 40.00 <br />$ 35,160.00 <br />20 <br />Adjust & Grout Manholes <br />EA <br />10 <br />$ 1,000.00 <br />$ 10,000.00 <br />21 <br />SWPPP <br />LS <br />1 <br />$ 20,000.00 <br />$ 20,000.00 <br />Trunk Line & Pavement - Subtotal Construction: <br />$ 907,510.00 <br />10% Contingency <br />$ 90,751.00 <br />Trunk Line & Pavement - Total Construction: <br />$ 998,261.00 <br />Total Construction & Engineering (12%): <br />$ 1,118,052.32 <br />Klotz Associates Project No. 0127.009.000 Fairmont Park East and Brookglen Drainage Study <br />m— 2nno Table 1 City of La Porte <br />