Laserfiche WebLink
Alternative 2 <br />Replace Existing Storm Trunk between Fleetwood Dr. and ROW <br />from Outfall to N. Sycamore & Minimizes Pavement Replacement <br />Item <br />No. <br />Item Description <br />Unit <br />Estimated <br />Quantity <br />Unit Price <br />Total Cost <br />1 <br />Mobilize & Prepare Right -of -Way <br />LS <br />1 <br />$ 10,000.00 <br />$ 10,000.00 <br />2 <br />Remove & Dispose of Existing Pavement <br />SY <br />293 <br />$ 3.00 <br />$ 880.00 <br />3 <br />Remove & Dispose of Existing Storm Pipe <br />LF <br />3,000 <br />$ 16.00 <br />$ 48,000.00 <br />4 <br />Excavation <br />CY <br />3,889 <br />$ 4.60 <br />$ 17,890.00 <br />5 <br />7" Reinforced Concrete Pavement Repair <br />(Include Subgrade) <br />SY <br />293 <br />$ 40.00 <br />$ 11,740.00 <br />6 <br />Curb Ramps <br />EA <br />21 <br />$ 3,300.00 <br />$ 69,300.00 <br />7 <br />Inlets Types A, B, C <br />EA <br />22 <br />$ 2,233.33 <br />$ 49,140.00 <br />8 <br />24" Reinforced Concrete Pipe <br />LF <br />330 <br />$ 60.00 <br />$ 19,800.00 <br />9 <br />48" Reinforced Concrete Pipe <br />LF <br />236 <br />$ 100.00 <br />$ 23,600.00 <br />10 <br />60" Reinforced Concrete Pipe <br />LF <br />540 <br />$ 150.00 <br />$ 81,000.00 <br />11 <br />6' x 5' Reinforced Concrete Box <br />LF <br />310 <br />$ 170.00 <br />$ 52,700.00 <br />12 <br />Tx 5' Reinforced Concrete Box <br />LF <br />849 <br />$ 220.00 <br />$ 186,780.00 <br />13 <br />8' x 6' Reinforced Concrete Box <br />LF <br />1,015 <br />$ 400.00 <br />$ 406,000.00 <br />14 <br />Manholes Include Tie in Exist. Pipe <br />EA <br />11 <br />$ 3,500.00 <br />$ 38,500.00 <br />15 <br />Wingwall with Headwall <br />EA <br />1 <br />$ 25,000.00 <br />$ 25,000.00 <br />16 <br />5" Concrete Riprap <br />SY <br />75 <br />$ 42.00 <br />$ 3,150.00 <br />17 <br />Cement Stabilized Sand <br />Ton <br />1,300 <br />$ 40.00 <br />$ 52,000.00 <br />18 <br />SWPPP <br />LS <br />1 Ts <br />20,000.00 <br />$ 20,000.00 <br />Trunk Line & Pavement Repair - Subtotal Construction: <br />$ 1,115,480.00 <br />10% Contingency <br />$ 111,548.00 <br />Trunk Line & Pavement Repair - Total Construction: <br />$ 1,227,028.00 <br />Total Construction & Engineering (12%): <br />$ 1,374,271.36 <br />Klotz Associates Project No. 0127.009.000 Fairmont Park East and Brookglen Drainage Study <br />May 2009 Table 2 City of La Porte <br />