My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-23-09 Drainage and Flooding Committee meeting minutes
LaPorte
>
.Minutes
>
Drainage and Flooding Committee
>
2009
>
03-23-09 Drainage and Flooding Committee meeting minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:46:48 AM
Creation date
7/31/2025 11:18:29 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
3/23/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Alternative 3 <br />Add Parallel Storm Trunk Under NB Fleetwood Dr. from Outfall to N. Spruce Dr. <br />& Replace NB Pavement from Mesquite to N. Spruce (2,200 LF) <br />Item <br />No. <br />Item Description <br />Unit <br />Estimated <br />Quantity <br />Unit Price <br />Total Cost <br />1 <br />Mobilize & Prepare Right -of -Way <br />LS <br />1 <br />$ 10,000.00 <br />$ 10,000.00 <br />2 <br />Remove & Dispose of Existing Pavement <br />SY <br />3,033 <br />$ 3.00 <br />$ 9,100.00 <br />3 <br />Remove & Dispose of Existing 60" CMP <br />LF <br />155 <br />$ 16.00 <br />$ 2,480.00 <br />4 <br />Excavation <br />CY <br />2,722 <br />$ 4.60 <br />$ 12,530.00 <br />5 <br />7" Reinforced Concrete Pavement (Include <br />Subgrade) <br />SY <br />3,033 <br />$ 40.00 <br />$ 121,340.00 <br />6 <br />Inlets Types A, B, C <br />EA <br />18 <br />$ 2,233.33 <br />$ 40,200.00 <br />7 <br />24" Reinforced Concrete Pipe <br />LF <br />270 <br />$ 60.00 <br />$ 16,200.00 <br />8 <br />5' x 5' Reinforced Concrete Box <br />LF <br />548 <br />$ 145.00 <br />$ 79,460.00 <br />9 <br />6' x 5' Reinforced Concrete Box <br />LF <br />556 <br />$ 170.00 <br />$ 94,520.00 <br />10 <br />Tx 5' Reinforced Concrete Box <br />LF <br />581 <br />$ 220.00 <br />$ 127,820.00 <br />11 <br />Tx 6' Reinforced Concrete Box <br />LF <br />521 <br />$ 330.00 <br />$ 171,930.00 <br />12 <br />8' x 6' Reinforced Concrete Box <br />LF <br />217 <br />$ 400.00 <br />$ 86,800.00 <br />13 <br />Junction Box <br />EA <br />1 <br />$ 10,000.00 <br />$ 10,000.00 <br />14 <br />Manholes <br />EA <br />9 <br />$ 3,000.00 <br />$ 27,000.00 <br />15 <br />Wingwall with Headwall <br />EA <br />1 <br />$ 25,000.00 <br />$ 25,000.00 <br />16 <br />5" Concrete Riprap <br />SY <br />75 <br />$ 42.00 <br />$ 3,150.00 <br />F17 <br />Cement Stabilized Sand <br />Ton <br />1,051 <br />$ 40.00 <br />$ 42,050.00 <br />18 <br />Adjust & Grout Manholes <br />EA <br />9 <br />$ 1,000.00 <br />$ 9,000.00 <br />19 1SWPPP <br />LS <br />1 <br />$ 20,000.00 <br />$ 20,000.00 <br />Trunk Line & Roadway - Subtotal Construction: <br />$ 908,680.00 <br />10% Contingency <br />$ 90,858.00 <br />Trunk Line & Roadway - Total Construction: <br />$ 999,438.00 <br />Total Construction & En-gineering (12%): <br />$ 1,119,370.66 <br />Klotz Associates Project No. 0127.009.000 Fairmont Park East and Brookglen Drainage Study <br />May 2009 Table 3 City of La Porte <br />
The URL can be used to link to this page
Your browser does not support the video tag.