My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-03-09 Drainage and Flooding Committee minutes
LaPorte
>
.Minutes
>
Drainage and Flooding Committee
>
2009
>
06-03-09 Drainage and Flooding Committee minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
7/31/2025 11:18:37 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
6/3/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />flows coming into the City from upstream. Reducing backwater effects in B 112-00-00 <br />involve channel modifications downstream of the confluence by modifying the channel <br />cross section or removing restrictions outside of the City limits or providing detention <br />upstream of the confluence. Locations where detention can be placed upstream are <br />limited to areas, which are located outside the City limits. Further study and <br />implementation of improvements are the responsibility of HCFCD who own and <br />maintain these channel. It is recommended the City request the Harris County Flood <br />Control District investigate drainage options along B112-00-00 to reduce flooding in <br />Brookglen Subdivision. <br /> <br />4-4 <br /> <br />Klotz Associates Project No. 0127.009.000 <br />May 2009 <br /> <br />Fairmont Park East & Brookglen Drainage Study <br />City of La Porte <br />
The URL can be used to link to this page
Your browser does not support the video tag.