My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-03-09 Drainage and Flooding Committee minutes
LaPorte
>
.Minutes
>
Drainage and Flooding Committee
>
2009
>
06-03-09 Drainage and Flooding Committee minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
7/31/2025 11:18:37 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
6/3/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Flooding and limited channel capacities within the City along BI12-00-00 are a result of <br />conditions that occur through the entire channel reach and are not just concentrated <br />within City limits. Removing the benches in Bl12-00-00, downstream of the confluence <br />with B112-02-00 and providing mitigation elsewhere are expensive and may serve to <br />lower flooding in the City; however, downstream backwater effects outside City limits <br />along with high flood flows from upstream areas of B112-00-00 create significant <br />changes to the flooding in this area of the City. To reduce flooding in Brookglen, the <br />HCFCD will need to implement improvements that address drainage issues both, inside <br />City limits and outside City limits. <br /> <br />5-2 <br /> <br />Klotz Associates Project No. 0127.009.000 <br />May 2009 <br /> <br />Fairmont Park East & Brookglen Drainage Study <br />City of La Porte <br />
The URL can be used to link to this page
Your browser does not support the video tag.