My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Drainage and Flooding Report January 2009
LaPorte
>
.Minutes
>
Drainage and Flooding Committee
>
Drainage and Flooding Reports
>
Drainage and Flooding Report January 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:49:18 AM
Creation date
7/31/2025 11:19:05 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Reports and Studies
Date
1/1/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I o t associates <br />If, however, Project 26 is removed from consideration, Projects 25 and 24 can also be removed <br />from consideration because they have more efficient options. Consequently, the largest <br />cost/benefit drops to only $87,500 (for Project 23) and the largest project cost drops to $8.3 <br />million (also for Project 23). The projects removed from consideration reduce the channels for <br />which projects remain from 10 to 8. Additional removals require more comprehensive <br />considerations that would involve City policy and funding considerations. <br />Project Subdivision/ Area Benefiting Type of Project Construction <br />ID { Improvement Construction Cost Per Loss <br />Removed' Cost Rved' <br />su �.m <br />13 ( Fairmont Park Fairmont Park East Channel Widening $781,000 ( $23,000 <br />14 Brookglen Channel Lining <br />$5 494 D00 g g $29,400 <br />11111_ <br />15 Meadow Park, Villa Del Rancho Channel Widening $1,701,000 $47,000 <br />16 Lennox Gardens, L Sheet Pond for Diversion $1,092,000 $50,000 <br />l8 Battleground Estates, Pinegrove Valley; P Channel Lining $1,032,000 $54,000 <br />Street <br />...� r ,wnm <br />19 Shady River Channel Widening, $361 000 $6fl 200 1 <br />__--- <br />21 Woods on the Bay, Pine Bluff, Shady Channel Widening $600,000 $75,000 <br />I <br />River <br />mm.2� �.v_e <br />Meadow Crest, Creekmont, Glen Pond for Diversion $8,314,000 $87,500 <br />- I <br />Meadows, Fairmont Park, Fairmont Park <br />West <br />I Total 8 Projects 1 $19,375,000 <br />Total Construction cost divided by the number of structures that have been reported in the past to have flooded and <br />for which recommended projects will alleviate flooding in the future. <br />Thus, in view of project cost/benefits and total projects costs, $87,500 per loss removed appears <br />to be a reasonable breakpoint for deciding whether channel improvements or diversion ponds are <br />1 <br />Klotz Associates Project No_ 0127.008.000 La Porte Citywide Drainage Study <br />January 2009 City of La Porte <br />
The URL can be used to link to this page
Your browser does not support the video tag.