Laserfiche WebLink
Clear Creek Watershed Regional Control Plan, Volume 2 <br />Prepared For: Harris County Flood Control District & Texas Water Development board <br />Prepared By: Dannenbaum Engineering Corporation <br />February 1992 <br />Klotz Associates was not given Volume 1 <br />Volume 2 contains the following: <br />Section VII - Combination Alternative <br />■ Descriptions of Alternative <br />■ Hydrologic and Hydraulic Analysis <br />o Design Criteria <br />o Hydrology <br />■ Sensitivity Analysis <br />■ Outlet Expansion <br />■ Regional Detention <br />o Hydraulics <br />■ Main Channel <br />■ Tributaries <br />■ Cost Analysis <br />■ Socioeconomic Considerations <br />■ Environmental Consequences <br />o Main Channel <br />o Tributaries <br />o Armand Bayou <br />o Third Outlet <br />o Mitigative Action <br />0 <br />Section VIII — Conclusion and Recommendations <br />■ Summary of Engineering Design Alternatives <br />■ Summary of Environmental Impacts <br />■ Recommendations <br />The recommendations based on the study are to implant a combination of the alternative <br />that was recommended. <br />