My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Drainage_and_Flooding_Report-dated_03-10-08
LaPorte
>
.Minutes
>
Drainage and Flooding Committee
>
Drainage and Flooding Reports
>
Drainage_and_Flooding_Report-dated_03-10-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:52:46 AM
Creation date
7/31/2025 11:19:14 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Reports and Studies
Date
3/10/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Preliminary Engineering Report For ens Road From 300 Feet North of Spencer Highway <br />to 300 Feet North of Avenue "H" PIN No. Cl/102/1002/005 <br />Prepared For: Harris County Flood Control District <br />Prepared By: Binkley & Barfield, Inc. Consulting Engineers <br />August 2006 <br />The proposed improvements to Sens Road will provide for a 5-lane concrete roadway <br />from approximately 300 feet north of spencer highway to 300 feet north of Avenue "H" <br />for a project length of 3,887 feet. The proposed concrete roadway will be drained by the <br />proposed storm sewer system. The proposed drainage system for Sens Road outfalls <br />within the Project Limits and consists of three storm sewer runs. Two of the runs will <br />outfall into the improved Little Cedar Bayou (HCFCD Unit F216-00-00) and the third <br />one will join the existing box culvert that flows to the south into the Bay Area Boulevard <br />system. The proposed storm sewer system for all areas will consist of the trunk line, <br />leads and proposed inlets. The existing box culvert at Little Cedar Bayou (F216-00-00) <br />will be replaced with a new culvert and outfalls for the tributary two storm sewer <br />systems. Little Cedar Bayou (HCFCD Unit F216-00-00)is proposed to be improved fir <br />storm water mitigation and maintaining the 100-year storm water surface elevation at the <br />existing water surface elevation. The limits of Little Cedar Bayou improvement will be <br />Sens Road on the west and the Union Pacific Railroad to the east. A Storm water <br />detention facility will not be required for Little Cedar Bayou due to the diversion of water <br />from Avenue "D" into the Bay Area Boulevard system. This project also includes a <br />proposed detention basin near Harris County Flood Control District Ditch A104-00-00 <br />and channel improvement on a portion of this ditch. <br />
The URL can be used to link to this page
Your browser does not support the video tag.