My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-01-1987 Meeting
LaPorte
>
.Minutes
>
La Porte Area Water Authority Board
>
1980's
>
1987
>
09-01-1987 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:00:49 PM
Creation date
7/31/2025 11:22:27 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Area Water Authority Board
Meeting Doc Type
Minutes
Date
9/1/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • <br />Contract Documents (but such review will only be to determine that their content <br />complies with the requirements of, and in the case of certificates of inspection, <br />tests and approvals the results certified indicate compliance with, the Contract <br />Documents); and shall transmit them to OWNER with written comments. <br />1.6.11 Inspections <br />ENGINEER shall conduct an inspection to determine if the work is <br />substantially complete and a final inspection to determine if the completed work is <br />acceptable so that ENGINEER may recommend, in writing, final payment to <br />Contractor(s) and may give written notice to OWNER and the Contractor(s) that the <br />work is acceptable (subject to any conditions therein expressed), but anq such <br />recommendation and notice will be subject to the limitations expressed in <br />paragraph 1.6.9.2. <br />1.6.12 Limitation of Responsibilties <br />ENGINEER shall not be responsible for the acts or omissions of any <br />Contractor, or of any subcontractor or supplier, or any of the Contractor(s)' or <br />subcontractor or supplier, or any of the Contractor(s)' or subcontractor's or <br />supplier's agents or employees or any other persons (except ENGINEER's own <br />employees and agents) at the site or otherwise furnishing or performing any of the <br />Contractor(s)' work; however, nothing contained in pazagraphs 1.6.1 thru 1.6.11 <br />inclusive, shall be construed to release ENGINEER from liablity for failure to <br />properly perform duties and responsibilities assumed by ENGINEER in the Contract <br />D ocuin ent s. <br />1.6.13 Record Drawings <br />ENGINEER shall prepare a set of reproducible (Mylaz) record prints of <br />drawings showing those changes made during the construction process, based on the <br />marked up prints, drawings and other data furnished by Contractor(s) to ENGINEER <br />and which ENGINEER considers significant. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.