My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-01-1987 Meeting
LaPorte
>
.Minutes
>
La Porte Area Water Authority Board
>
1980's
>
1987
>
09-01-1987 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:00:49 PM
Creation date
7/31/2025 11:22:27 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Area Water Authority Board
Meeting Doc Type
Minutes
Date
9/1/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />1.T Operational Phase <br />During the Operational Phase, ENGINEER shall, when requested by <br />OWNER: <br />1.7.1 Provide assistance in the closing of any financial or related transaction <br />for the Project. <br />1.7.2 Provide assistance in connection with the startup, refining and adjusting <br />of any equipment or system. <br />1.7.3 Assist OWNER in training OWNER's staff to operate and maintain the <br />Project. <br />1.7.4 Assist OWNER in developing systems and procedures for control of the <br />operation and maintenance of and record keeping for the Project. <br />1.?.5 In company with OWNER, visit the Project to observe any apparent <br />defects in the completed construction, assist OWNER in consultations and <br />discussions with Contractor(s) concerning correction of such deficiencies, and make <br />recommendations as to replacement or correction of defective work. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.