My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-01-1987 Meeting
LaPorte
>
.Minutes
>
La Porte Area Water Authority Board
>
1980's
>
1987
>
09-01-1987 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:00:49 PM
Creation date
7/31/2025 11:22:27 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Area Water Authority Board
Meeting Doc Type
Minutes
Date
9/1/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • <br />SECTION 2 -ADDITIONAL SERVICES OF ENGINEER <br />2.1 Services Requiring Authorization in Advance <br />If authorized in writing by OWNER, ENGINEER shall furnish or obtain <br />from others Additional Services of the types listed in paragraphs 2.1.1 through <br />2.1.14, inclusive. These services are not included as pazt of Basic Services except to <br />the extent provided otherwise in Exhibit A "Further Description of Basic <br />Engineering Services and Related Matters"; these will be paid for by OWNER as <br />indicated in Section 5. <br />2.1.1 Preparation of applications and supporting documents (in addition to <br />those furnished under Basic Services) for private or governmental grants, loans or <br />advances in connection with the Project; preparation or review of environmental <br />assessments and impact statements; review and evaluation of the effect on the <br />design requirements of the Project of any such statements and documents prepared <br />by others; and assistance in obtaining approvals of authorities having jurisdiction <br />over the anticipated environmental impact of the Project. <br />2.1.2 Services to make measured drawings of or to investigate existing <br />conditions or facilities, or to verify the accuracy of drawings or other information <br />furnished by OWNER <br />2.1.3 Services resulting from significant changes in the general scope, extent <br />or cliazacter of the Project or its design including, but not limited to, changes in <br />size, complexity (including an increase above the eight proposed customer service <br />points), OWNER's schedule, character of construction or method of financing; and <br />revising previously accepted studies, reports, design documents or Contract <br />Documents when such revisions are required by changes in laws, rules, regulations, <br />ordinances, codes or orders enacted subsequent to the preparation of such studies, <br />reports or documents, or aze due to any other causes begond ENGINEERS's control. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.