Laserfiche WebLink
<br />Sylvan Beach Shoreline Protection and Nourishment Project <br />Technical Memorandum of Survey Update and Cost Estimate Summary <br /> <br />3.0 COST ESTIMATE UPDATE <br /> <br />The update to the cost estimate involved three major modifications as it relates to the project. <br />The modifications are as listed below: <br /> <br />· Price level adjustments as it relates to the rise in costs based on inflation between <br />2003 and 2008. <br /> <br />· Changes to quantities related to the updated survey information; and <br /> <br />· Additions/Changes to the estimate that were previously not included. <br /> <br />Price Level Adiustments <br /> <br />Items within the cost estimate were revised based on adjustments in price levels from 2003 to <br />2008. The main adjustments occurred to the following items located in Table 1 below: <br /> <br />Table 1: Price Level Adjustments in Estimate <br /> <br />Item <br />Armor Stone <br />Crushed Concrete Fill <br />Sand <br />Aluminum Bleacher Seat <br /> <br />2003 Cost <br />$ 50.00 <br />$ 20.00 <br />$ 15.00 <br />$ 300.00 <br /> <br />2008 Cost <br />$ 68.00 <br />$ 29.00 <br />$ 22.00 <br />$ 350.00* <br /> <br />*Price may increase if a more architectural appealing option is selected. <br /> <br />Costs for armor Stone varied based on the contractor and the type of stone. Two different types <br />of armor Stone were priced out based on required specifications and aesthetic quality. The <br />vendors, stone type, delivery methods, and total costs are shown in Table 2 below: <br /> <br />Table 2: Armor Stone Suppliers <br /> <br />SUDDlier <br />Gulf Coast Limestone <br />Avila Stone <br />Luhr Brothers <br /> <br />Stone <br />~ <br />Limestone <br />Granite <br />Limestone <br /> <br />Deliverv <br />Method <br />Truck <br />Barge <br />Barge <br /> <br />Total Cost Ranae <br />Delivered and <br />Installed lDer ton) <br />$67.00 - $77.00 <br />$52.00 - $72.00 <br />$65.00 - $75.00 <br /> <br />*Range varies due to fuel costs <br /> <br />3-1 <br /> <br />Last Revised: OS/23/08 <br />