My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-09-08 Special Called Meeting of the La Porte Development Corporation Board of Directors
LaPorte
>
.Minutes
>
La Porte Development Corporation/Type B
>
2000's
>
2008
>
06-09-08 Special Called Meeting of the La Porte Development Corporation Board of Directors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:22:25 PM
Creation date
7/31/2025 11:23:32 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Development Board Corporation/Type B
Meeting Doc Type
Minutes
Date
6/9/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Sylvan Beach Shoreline Protection and Nourishment Project <br />Technical Memorandum of Survey Update and Cost Estimate Summary <br /> <br />Chanaes to Quantities based on Uodated SUNev Information <br /> <br />The recent survey performed by Landtech Consultants showed a slight increase in depth at the <br />eastern region of the groins. The increase in depth resulted in slight changes in stone and <br />barge access channel dredging quantities. The changes in quantities are located in Table 3 <br />below: <br /> <br />Table 3: Quantity Changes Based on Updated Survey <br /> <br />Item <br />Armor Stone <br />Barge Access Dredging* <br /> <br />2003 <br />Quantitv <br />10,600 tons <br />4,800 CY <br /> <br />2008 <br />Quantitv <br />10,840 tons <br />3,900 CY <br /> <br />*Quantity in Cost Estimate is shown as Lump Sum <br /> <br />AdditionslChanaes to the Cost Estimate <br /> <br />Additional items in the estimate that have been added include lighting plan and a fee for <br />engineering oversight services during construction and bond fees. The additional items are <br />included in Table 4 below: <br /> <br />Table 4: Cost Estimate Additional Items <br /> <br />Item <br />Engineering of Lighting Plan <br />Themed Lighting Structure <br />Conduit for Lighting <br />Ground Boxes for Lighting <br />Engineering Oversight <br />Performance Bond (2% of Total Cost) <br />Payment Bond (2% of Total Cost) <br /> <br />Unit <br />L.S. <br />Each <br />L.F. <br />Each <br />L.S. <br />L.S. <br />L.S. <br /> <br />Quantitv <br />1 <br />10 <br />2300 <br />30 <br />1 <br />1 <br />1 <br /> <br />Unit Price <br />$15,000.00 <br />$2,700.00 <br />$7.00 <br />$75.00 <br />$107,000.00 <br />$54,311.00 <br />$54,311.00 <br /> <br />Extended Price <br />$15,000.00 <br />$27,000.00 <br />$16,100.00 <br />$2,250.00 <br />$107,000.00 <br />$54,311.00 <br />$54,311.00 <br /> <br />The Estimated Probable Cost for the project is located on Table 5 on the next page. <br /> <br />3-2 <br /> <br />Last Revised: OS/23/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.