Laserfiche WebLink
<br />Bid Additive 4 - Revetment North of Fishing Pier <br />Item Description Unn Quantity Unn Price Extended Price <br />1 Mob/Demob LS 1 $0.00 $0.00 <br />2 Barge Access Channel Dredging LS 1 $7,000.00 $7,000.00 <br />3 RemovaVDisposal of Bulkhead LF 800 $20.00 $16,000.00 <br />4 Recycle Existing Rubble, Remove Unsunable LS 1 $10,000.00 $10,000.00 <br />5 South Area Revetment Construction <br /> a Provide and Place Crushed Concrete Fill Tons 1275 $29.00 $36,975.00 <br /> b Provide and Place Armor Stone Tons 2665 $68.00 $181,220.00 <br /> c Provide and Place Toe Protection Stone Tons 185 $30.00 $5,550.00 <br /> d Provide and Place Open Cell CCM SY 1200 $85.00 $102,000.00 <br /> e Provide and Place Concrete Walkway LF 825 $165.00 $136,125.00 <br /> f Provide and Place Stainless Steel Railing at ADA Ramp LF 88 $75.00 $6,600.00 <br /> g Provide and Place Concrete Bollard and Rope Barrier Railing LF 245 $15.00 $3,675.00 <br /> h Provide and Place Aluminum Bleacher Seat/Railing Each 56 $350.00 $19,600.00 <br /> Provide and Place Geotextile SY 5070 $4.50 $22,815.00 <br /> j Provide and Place Stonnwater Outfalls Each 1 $5,000.00 $5,000.00 <br /> k Remove and Replace Cyclone Fence at Pier LS 1 $500.00 $500.00 <br /> I Excavation, Fill, and Grading LS 1 $15,000.00 $15,000.00 <br />6 Hydro-mulch Seeding LS 1 $1,000.00 $1,000.00 <br />7 Pre and Post Construction Surveying LS 1 $2,000.00 $2,000.00 <br />Bid Additive 5 - Groins North of Fishing Pier <br />1 MoblDemob LS 1 $0.00 $0.00 <br />2 Barge Access Channel Dredging LS 1 $10,000.00 $10,000.00 <br />3 Provide and Place Armor Stone Tons 2580 $68.00 $175,440.00 <br />4 Provide and Place Core Stone Tons 795 $30.00 $23,850.00 <br />5 Provide and Place Toe Protection Stone Tons 225 $30.00 $6,750.00 <br />6 Provide and Place Geotextile SY 2000 $4.50 $9,000.00 <br />7 Provide and Place Signs and Markers LS 1 $2,000.00 $2,000.00 <br />8 Pre and Post Construction Surveying LS 1 $500.00 $500.00 <br />Bid Additive 6 - Small Beach Fill North of Fishing Pier <br />1 Mob/Demob LS 1 $0.00 $0.00 <br />2 Provide and Place Sand Fill Tons 5200 $22.00 $114,400.00 <br />3 Provide and Place Swim Line System Each 1 $3,000.00 $3,000.00 <br />4 Pre and Post Construction Surveying LS 1 $500.00 $500.00 <br />Bid Additive 7 - Large Beach Fill North of Fishing Pier <br />1 Provide and Place Sand Fill Tons 16700 $22.00 $367,400.00 <br /> <br />Item Subtotals <br /> <br />$0.00 <br />$7,000.00 <br />$16,000.00 <br />$10,000.00 <br /> <br />$535,060.00 <br />$1,000.00 <br />$2,000.00 <br />Bid Additive 4 Subtotal <br /> <br />$0.00 <br />$10,000.00 <br />$175,440.00 <br />$23,850.00 <br />$6,750.00 <br />$9,000.00 <br />$2,000.00 <br />$500.00 <br />Bid Additive 5 Subtotal <br /> <br />$0.00 <br />$114,400.00 <br />$3,000.00 <br />$500.00 <br />Bid Additive 6 Subtotal <br /> <br />Engineering During Construction <br /> <br />TOTAL NORTH END ESTIMATED CONSTRUCTION COST <br /> <br />$367,400.00 <br />Bid Additive 7 Subtotal <br /> <br />Performance Bond (2%) <br /> <br />Payment Bond (2%) <br /> <br />TOTAL PROJECT ESTIMATED CONSTRUCTION COST <br /> <br />Contingency (10%) <br /> <br />TOTAL PROJECT ESTIMATED CONSTRUCTION COST WITH CONTINGENCY <br /> <br />Bid Additive 8 - Themed Lighting <br />1 Themed Lighting <br />a <br />b <br />c <br /> <br />Structure Each <br />Condun LF <br />Ground Box Each <br /> <br />10 <br />2300 <br />30 <br /> <br />$2,700.00 <br />$7.00 <br />$75.00 <br /> <br />$27,000.00 <br />$16,100.00 <br />$2,250.00 <br /> <br />Engineering of Lighting Plan <br /> <br />$45,350.00 <br />Bid Additive 8 Subtotal <br /> <br />TOTAL PROJECT ESTIMATED CONSTRUCTION COST WITH LIGHTING AND CONTINGENCY <br /> <br />$571,060 <br /> <br />$227,540 <br /> <br />$117,900 <br /> <br />$367,400 <br /> <br />$1,283,900 <br /> <br />$107,000 <br /> <br />$54,311 <br /> <br />$54,311 <br /> <br />$2,931,193 <br /> <br />$282,419 <br /> <br />$3,213,612 <br /> <br />$45,350 <br /> <br />$15,000 <br /> <br />$3,273,962 <br />