Laserfiche WebLink
<br />Lakes at Fairmont Greens <br />Phase I Sanitary Sewer <br /> <br />ON-SITE SANITARY COLLECTION SYSTEM TRUNK LINE <br />1. Manholes: <br /> a. Standard Precast Manhole 19 EA $ 1,250.00 $ 23,750.00 <br />2. Extra Depth for Standard Manhole <br /> a. 8' - 12' Depth 57 VF $ 70.00 $ 3,990.00 <br /> b. Over 12' Depth 38 VF $ 100.00 $ 3,800.00 <br />3. SDR 26 P.V.c. Sewers (including Bedding) <br /> a. 24" Pipe (all cuts) 2,532 LF $ 80.00 $ 202,560.00 <br />4 Miscellaneous Items <br /> a. Trench Safety System 2,532 LF $ 1.00 $ 2,532.00 <br />The following are to be used only when directed by the Engineer using methods approved by the Engineer and will <br /><-Ix: paid for per the unit prices. Utilization of these items will depend on site conditions at the time of construction. <br />5 Well Point Dewatering ($20.00 minimum) 2,532 LF $ 20.00 $ 50,640.00 <br />6 Modified" A-A" Bedding and all <br /> appurtenances for wet sand construction <br /> (per plans). ($10.00 minimum) 2,532 LF $ 20.00 $ 50,640.00 <br />7 Manhole Base for Wet Sand Construction <br /> ($1,000.00 minimum) 14 EA $ 1,000.00 $ 14,000.00 <br /> Total, On-Site $ 351,912.00 <br />