Laserfiche WebLink
<br /> Lakes at Fairmont Greens <br /> Phase I Sanitary Sewer <br />OFF-SITE SANITARY COLLECTION SYSTEM <br />1. Manholes: <br /> a. Standard Precast Manhole 2 EA $ 1,250.00 $ 2,500.00 <br />2. Extra Depth for Standard Manhole <br /> a. 8' - 12' Depth 8 VF $ 70.00 $ 560.00 <br /> b. Over 12' Depth 6 VF $ 100.00 $ 600.00 <br />3. SDR 26 P.V.c. Sewers (including bedding) <br /> a. 24" Pipe (all cuts) 200 LF $ 80.00 $ 16,000.00 <br />4. C900-DRI8 PVC FM (class 150, all cuts) <br /> a. 6" Pipe - Interim (includes all fittings) 3,653 LF $ 16.00 $ 58,448.00 <br />5. Lift Station LS $ 200,000.00 $ 200,000.00 <br />6. Miscellaneous Items <br /> a. Connect 24" Sanitary to existing MH EA $ 700.00 $ 700.00 <br /> b. Trench Safety System 3,853 LF $ 1.00 $ 3,853.00 <br /> c. Upgrade Existing Lift Station (north end) LS $ $ <br /> <br />The following are to be used only when directed by the Engineer using methods approved by the Engineer and will <br />be paid for per the unit prices. Utilization of these items will depend on site conditions at the time of construction. <br />7. Well Point Dewatering ($20.00 minimum) 150 LF $ 20.00 $ 3,000.00 <br />8. Modified "A -A" Bedding and all <br /> appurtenances for wet sand construction <br /> (per plans). ($10.00 minimum) 150 LF $ 20.00 $ 3,000.00 <br />9. Manhole Base for Wet Sand Construction <br /> ($1,000.00 minimum) 2 EA $ 1,000.00 $ 2,000.00 <br /> Total, Off-Site $ 290,661.00 <br /> Total, On and Off-Site Sanitary Sewer Trunk Line $ 642,573.00 <br />