My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-28-07 Meeting of the La Porte Redevelopment Authority minutes
LaPorte
>
.Minutes
>
LP Redevelopment Authority
>
2000's
>
2007
>
02-28-07 Meeting of the La Porte Redevelopment Authority minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 4:29:10 PM
Creation date
7/31/2025 11:25:16 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Redevelopment Authority/TIRZ
Meeting Doc Type
Minutes
Date
2/28/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> CHANGE ORDER REQUEST <br />REQUEST: #1 I ABE JOB NO. 0624 <br />PROJECT TITLE: PORT CROSSING <br />C.R. TITLE: City of La Porte, Harris Co., and TxDOT approved changes <br />CONTRACTOR: Angel Brothers Enterprises, Ltd. Proiect ManaQer: Kevin Guy <br />PHONE: 281.421.5721 FAX: 281.421.5796 <br />OWNER: Port Crossing Land, L.P. Proiect ManaQer: Russell Plank <br />PHONE: 713.578.1234 FAX: 713.734.5544 <br />ENGINEER: Goldston Engineering, Inc. Proiect ManaQer: Jason Eckert, P.E. <br />PHONE: 713.977.8291 FAX: 713.977.7466 <br />APPLICABLE SPECIFICATION SECTIONS AND DRAWING SHEETS: <br />Project Manual Sec. Specification Sec. DWG. SHEET NO'S <br />Project Manual Sec. Specification Sec. DWG. SHEET NO'S <br />DESCRIPTION OF PROBLEM OR QUESTION: Sketch Attached: Yes r No I <br />Please see the attached breakdown reflecting the requested change order amount below. <br /> DESCRIPTION QUAN. UNIT UNIT PRICE TOTAL <br />Change Order Total per Attached Breakdown 1 LS $334,707.40 $334,707.40 <br /> Total Addition to Contract I $334,707.40 <br />CHANGE IN THE PROJECT COST TO OWNER: YES .lL- AMOUNT $334.707.40 NO - <br />CHANGE IN THE PROJECT SCHEDULE? YES - DAYS NO -X- <br />Kevin Guy Kevin Guy Project Manager 3/29/2007 <br />SIGNATURE OF CONTRACTOR REPRESENTATIVE PRINTED NAME TITLE DATE <br />APPROVED BY ENGINEER PRINTED NAME TITLE DATE <br />ACCEPTED BY OWNER PRINTED NAME TITLE DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.