Laserfiche WebLink
<br />- <br /> <br /> - <br />Ancel Bros. SummarY of Costs - Port Crossina Chance Order #1 <br /> ORIGINAL <br />BID CONTRACT PLAN ADD TOTAL OVERRUN <br />ITEM DESCRIPTION OF WORK QUANTITY QUANTlnCHANGES QUANTITY QUAN UNIT UNIT PRICE TOTAL Totals - <br />Lift Station - City of La Porte ICLPI <br /> 59a LIFT STATION & APPURTENANCES 0 0 1 1 LS $252,600.00 $252,600.00 - <br /> 48 6' Dia., 25' Deep Wet Well & Cover 1 0 -1 EA $155,000.00 -$155,000.00 <br /> 49 E..ctrical Control System for Lift Sta~on 1 0 -1 EA $22,000.00 -$22,000.00 <br /> 50 EOlctrical SeNice Drops 1 0 -1 EA $1,100.00 -$1,100.00 <br /> 51 Telephone SeNice Connect 1 0 -1 EA $300.00 -$300.00 <br /> 52 6" DIP FJ 40 0 -40 LF $65.00 -$2,600.00 <br /> 53 6"X6" DIP Tee 2 0 -2 EA $200.00 -$400.00 - <br /> 54 SWing Arm Check Valve 2 0 -2 EA $925.00 -$1,850.00 <br /> 55 6" 900 DIP Bend 4 0 -4 EA $150.00 -$600.00 <br /> 56 6" 450 DIP Bend 2 0 -2 EA $150.00 -$300.00 <br /> 57 DIP to PVC Trens Piece 4 0 -4EA $200.00 -$800.00 <br /> 58 Proledve Coe~ng for DIP Associated wi Lift Sta~on 130 0 -130 LF $29.00 -$3770.00 <br /> $63.880.00 $63,880.00 - <br />Headwalls - Harris County & CLP <br /> 14b Reinforced Concrete HeadwaHs (Wharton Weems @ Channel) 0 0 94 94 94 CY $1,000.00 $94,000.00 <br /> 79d Reinforced Concrete HeadwaUs (Export Drive @ Channel) 0 0 63 63 63 CY $1,000.00 $63,000.00 <br /> 79b Ril>-Rap Associated with RCS Under Export Drive t65 0 0 -165 SY $44.00 -$7 260.00 - <br /> $149,740.00 $149,740.00 <br />SH 146 a1 W. WeemslExDort - TxDOT <br /> 20 24" RCP Not Under Pavement 0 0 88 88 88 LF $51.50 $4,532.00 <br /> 80a 18" RCP Not Under Pavement 0 0 40 40 40 LF $41.00 $1 640.00 - <br /> $6,172.00 $6,172.00 <br />24" RCP v. 18" RCP - Harris County <br /> 20 24" RCP Not Under Pavement 0 0 2544 2544 2544 LF $51.50 $131,016.00 <br /> 80 24" RCP Not Under Pavement 0 0 386 386 386 LF $53.00 $20.458.00 - <br /> 20b 18" RCP Not Under Pavement 0 0 -2284 -2284 -2284 LF $41.00 -$93,644.00 <br /> 80a 18" RCP Not Under Pavement 0 0 -316 -316 -316 LF $41.00 -$12956.00 <br /> $44,874.00 $44,874.00 <br />Extend 12-inch Waterline to McCabe Rd. <br /> 24 Flushing Valve & Assembly 0 0 6 6 6EA $2,200.00 $13,200.00 <br /> 25 12" Water Line Not Under Pavement 0 0 1500 1500 1500 LF $28.00 $42000.00 <br /> $55,200.00 $55,200.00 <br />PrsD Work for Placement of Fill - <br />2 & 3 4" Stripping of organic material per Testing Lab 0 0 5338 5338 5338 CY $2.30 ~ <br /> $12,277.40 $12,277.40 <br />Relocate Gas lina on N. end of Powell (conflict wI Utilities)- $2 564.00 <br />TOTAL CHANGE ORDER #1 AMOUNT $334,707.40 <br />Orioinal Contract Amount $6,327,063.10 <br />REVISED CONTRACT TOTAL $6,661,770.50 <br /> <br />- <br /> <br />- <br /> <br />- <br />