My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-24-07 Meeting of the La Porte Redevelopment Authority minutes
LaPorte
>
.Minutes
>
LP Redevelopment Authority
>
2000's
>
2007
>
05-24-07 Meeting of the La Porte Redevelopment Authority minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 4:29:10 PM
Creation date
7/31/2025 11:25:20 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Redevelopment Authority/TIRZ
Meeting Doc Type
Minutes
Date
5/24/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Jun.20. 2007 1:47PM City of LaPorte City Hal] <br /> <br />No. 9208 P. 2 <br /> <br />- <br /> <br />DAC Realty Group, Inc. <br /> <br />Commercial Real Estate Services <br />900 Town & Country Lane. , Suite 330J Houston, Texas 77024 <br />Phone: 713/973-2100, Fax: 713/973-2166, E-mail don@dacrealty.com <br /> <br />- <br /> <br />May 8, 2007 <br /> <br />Mr. 10hn 10ems <br />Interim City Manager <br />City of LaPorte <br />604 West Fainnont Parkway <br />Laporte, Texas 77571 <br /> <br />- <br /> <br />- <br /> <br />Re: TRIZ Reimbursement <br /> <br />Dear Mr. Joems: <br /> <br />In reply to your letter dated May 1, 2007 and per your request, I have attached <br />the following information that you requested. <br /> <br />. - <br /> <br />( <br /> <br />1. Color renderine of what the project will look like when completed <br /> <br />2. Site Data: See the enclosed Site Data Sheet. <br /> <br />- <br /> <br />3. Room Lavout <br /> <br />4. Site Lavout: It shows the physical layout of the 83 CandIewood Inn & <br />Suites (CandIewood is a division of Holiday Inn, Memphis, Tennessee.) <br /> <br />5. Total Construction Costs : Three Million Five Hundred Thousand <br />. Dollars ($3.500.000) Estimated Total Project Costs for Ad Valorem Value <br />including land Costs <br /> <br />- <br /> <br />l_ <br /> <br />6. Road Construction to Start Julv 1. 2007 with completion scheduled <br />for Julv 20th 2007 (47' wide 500' Long) will continue from where 13th <br />Street currently stops at West "K" Street south to West "L" Street. All <br />specifications are per City of La Porte. This Cost is approximately One <br />. Hundred and Ninety-Six Thousand Dollars ($196,000). That includes all <br />Engineering, Architecture, Surveying, Topographic Studies, Soil Tests and <br />construction costs <br /> <br />- <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.