Laserfiche WebLink
w <br />-57- <br />facilities required by the City. A reimbursement <br />contract will be negotiated between the City • <br />Council and the Developer. <br />SECTION 9.00 RECORD DRAWINGS <br />The Engineer representing the developer must pre- <br />sent to the Director, reproducible complete "re- <br />cord drawings" for all paving, drainage struc- <br />tures, water lines and sewer lines within thirty <br />(30) days after completion of each contract. <br />The Director will not certify approval of public <br />improvements construction until record drawings <br />have been submitted. <br />SECTION 10.00 FEES AND CHARGES <br />The following schedule of fees and charges shall be • <br />paid into the general fund of the City of La Porte <br />when any map or plat is tendered to the Director, and <br />each of the fees and charges provided herein shall be <br />paid in advance, and the City Planning Commission shall <br />take no action until the fee shall have been paid. <br />General Plans and Preliminary Plats: S per plat <br />Final Plats and Major Development Plats: S per <br />plat <br />Minor Development Plats: S per plat <br />SECTION 11.00 ENGINEERING AND CONSTRUCTION STANDARDS FOR SUF3DIVISION <br />11.01 STREETS AND ALLEYS <br />All streets shall be reinforced concrete pavement on a <br />compacted subgrade. Concrete pavement shall be provided <br />