My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-18-1993 Public Hearing and Regular Meeting of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
1990's
>
1993
>
03-18-1993 Public Hearing and Regular Meeting of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:36 AM
Creation date
7/31/2025 11:27:35 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
3/18/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'. <br />• Planning & Zoning Commission <br />Bayou Forest Subdivision <br />Staff Report of 429-93 <br />Based on the review of this plan, staff finds it not to be in compliance with the intent and <br />requirements of the Development Ordinance. There are several areas which will require <br />revision or modification. As a recap, these areas are as follows: <br />1. Specify type of development. <br />2. Include block for filing date. <br />3. Plot utility easements. <br />4. Revise the designation of "Unrestricted Reserve A". <br />5. Plot utility easements. <br />6. Plot building setback lines. <br />7. Indicate flood plain designations and boundaries. <br />8. Complete and submit a Development Checklist. <br />9. Submittal of an application for a Conditional Use Permit. <br />10. Renaming Streets. <br />After reviewing the Bayou Forest General Plan, staff has determined that the subdivision <br />as proposed is not in substantial compliance with the requirements of Development <br />Ordinance 1444. The issues noted above are essentially items which need to be revised or <br />redesigned. Staff, therefore, recommends denying Conditional Approval of the General <br />Plan. This denial will allow the applicants sufficient time to revise the General Plan as well <br />as submit their application for a Conditional Use Permit. <br />Page6of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.