Laserfiche WebLink
• <br />• <br />,. , <br />Page2of3 <br />• Bayou Forest <br />Staff Report/5-20-93 <br />on the revised General Plan; specifically dimension and arrangement of commercial lots and <br />driveway arrangement. As these issues have a direct bearing on both the General Plan and <br />rezoning request, it would not be appropriate for the Commission to grant approval or <br />conditional approval of the General Plan as presently drawn. <br />There is additionally one other item which should be addressed. This regards the <br />benchmark notes on Sheet 4 of the General Plan (this sheet is not included in the <br />Commission's agenda packet). The first note "NGS K120 (1973) 9.43' references a National <br />Geodetic survey monument. The location of this monument should be noted. The second <br />note, "City of La Porte B.M.#62 10.86" should be deleted. <br />Also to be noted, Section 6.01 of the Development Ordinance will require that a minimum <br />of one (1) permanent survey control monument be shown at the preliminary plat stage for <br />each five (5) acres platted. One (1) monument is to be accurately tied to an approved City <br />of La Porte monument by angle and distance, at the General Plan stage; reference to a City <br />of Ia Porte monument is not necessary. <br />i Finally, the applicant is to provide the City (and Harris County Flood Control) a report <br />regarding the lagoons proposed for storm water detention. This report is to detail detention <br />capacity, provisions for mosquito control and responsibility for maintenance and upkeep. <br />As of the date of this writing (5-12-93), the applicant has not yet submitted the requested <br />report. If the report is submitted prior to the May 20, meeting, staff will provide copies to <br />the Commission. <br />Development Ordinance Section 4.O1.C empowers the Planning and Zoning Commission to <br />take three courses of action after reviewing a General Plan. They are as follows: <br />1. Approval: <br />Commission approval of the General Plan authorizes the developer to file a <br />Preliminary Subdivision Plat or a Development Site Plan. <br />2. Conditional Approval: <br />Commission conditional approval requires submission of an amended General <br />Plan and additional documentation as specified by the Planning Commission <br />for final Commission approval; which may be filed concurrently with the next <br />Preliminary Plat or Development Site Plan, as the case may be. <br /> <br />