My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-20-1997 Regular Meeting of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
1990's
>
1997
>
03-20-1997 Regular Meeting of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:35 AM
Creation date
7/31/2025 11:28:13 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
3/20/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Boncosky Trucking TeTRiinal • <br />4/17/97 - P&Z Meeting <br />Page 6 of 6 <br />15. Building lines need to be depicted for future reference. Due to <br />the industrial nature of the business, the setback should comply <br />with Heavy Industrial property. The front setback is 50', side <br />setbacks are 30' and the rear setback is 50'. <br />16. This portion of Powell (16~` Street) is not a designated truck <br />route. This action would need to occur to allow the <br />development of the property. <br />17. Proposed landscaping shall be subject to approval by the <br />Director of Planning. <br />18. Materials for the truck parking area need to be identified to <br />confirm dust-free surfacing and confirm year round access to <br />the fire hydrant. <br />A proval of the General Plan by the Commission authorizes the <br />developer to file a Preliminary Plat or Development Site Plan, as <br />the case may be. <br />Conditional Approval of the General Plan by the Commission <br />requires the submission of an amended General Plan and additional <br />documentation as specified by the Commission. This may be filed <br />concurrently with the Preliminary Plat or Development Site Plan. <br />Disapproval of the General Plan by the Commission requires <br />submission of a new General Plan. <br />A number of critical issues remain; therefore, Staff suggests the <br />submittal of the general plan may be premature. The Commission <br />may wish to consider "Disapproval" of the general plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.