My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-18-2002 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
2000's
>
2002
>
04-18-2002 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:34 AM
Creation date
7/31/2025 11:29:04 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
4/18/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />2.3 Additional Land Use Restrictions. Owner/Developer agrees to conform all <br />development and improvements to the Tract to the City's Code of Ordinances and <br />established policies, and further agrees that land uses shall be further restricted <br />according to "Exhibit Oil. <br /> <br />ARTICLE III. RESTRICTIVE COVENANTS <br /> <br />3.1 Development of 'Restrictive Covenants. Owner-Developer has developed- <br />Draft Declaration of Restrictive Covenants for Texas Import-Export Park, which are <br />attached to this Agreement as Exhibit liE", These protective covenants and deed <br />restrictions will apply to and be binding upon the Tract, and shall be in form <br />substantially similar to Exhibit liE", , The covenants and deed restrictions shall be <br />approved by the City and shall be recorded concurrently with each recorded plat. <br /> <br />ARTICLE IV. TERMINATION <br /> <br />4.1 Term. This Agreement shall have a term commencing on the date first written <br />above, and continuing until the sooner to occur of (i) the date in which all portions,oMb.e <br />Tract have been platted and developed (with construction of all streets and utilities on <br />the Tract as reflected by the plats completed or installed and financed by the Owner- <br />Developer). <br /> <br />I <br />Failure of Owner-Developer to begin construction in accordance with the Special <br />Conditional Use Pel111it within one year after issuance of said permit, or as scheduled <br />under the terms of the Special Conditional Use Permit, shall terminate this Agreement. <br />Owner-Developer may, before the expiration of one year, request an extension of time <br />from the Planning and Zoning Commission, in the event that construction has not <br />started in accordance with the Special Conditional Use Permit. <br /> <br />ARTICLE V.' OPEN SPACElTRAIL, BUFFERING AND <br />BEAUTIFICATION <br /> <br />5.1 Open Space/Pedestrian Trail System. The Owner-Develop~r shall provide <br />common open space as shown in Comprehensive Plan and the General Plan, including <br />any required portion of planned . City trail system within the project. This will be <br />incorporated within the shown drainage easement and detention pond/drainage <br />system, the cross-section details of which are further illustrated on the attached Exhibit <br />F. <br /> <br />'It is recognized that, until the final design of the detention pond/drainage system is <br />approved, the exact location and dimensions of these facilities is unknown. When the <br />final design is approve~ the City will evaluate the potent~al for use of these areas as <br />public recreation amenities. ' <br />At that time and with mutual consent, the City may elect to accept these facilities either <br />in easement or fee. The initial development, of the detention pond/drainage system <br /> <br />TIEP 2002 Development Agreement-Final.doc <br /> <br />Page 30f9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.