My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-18-2002 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
2000's
>
2002
>
04-18-2002 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:34 AM
Creation date
7/31/2025 11:29:04 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
4/18/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />and perimeter landscaping of these facilities shall be the responsibility of the Owner - <br />Developer. The responsibility of ongoing maintenance of these facilities shall also be <br />determined after reviewing the final design. <br /> <br />5.2 Buffering and Beautification. The Owner-Developer shall implement a uniform <br />and/or col11patible landscape plan for all phases of the entire project that will address <br />landscaping provisions not only adjacent to Wharton Weems Blvd. and Powell Road, <br />but also within the building setbacks and landscape easements or reserves throughout. <br />A Landscape Buffer (100-feet wide) shall be provided along the west side of Powell <br />Road and shall include extensive screening-type vegetation with grassed berms within <br />the existing pipeline easement. A landscape buffer, 50' wide, will also be provided <br />along State Highway 146. Landscape reserves shall also be included adiacent to all <br />roadways, including the east side of Powell; but rather than screen, shall be <br />landscaping compatible with the ultimate use of that adjacent property.' <br /> <br />5.3 Signage. The Owner-Developer shall implement a sign standards policy, as <br />part of the De~laration of Restrictive Covenants (Exhibit "E") consistent with the City's <br />Code of Ordinances as guidance to insure effective and uniform signage is emplo~ed <br />throughout the project. This policy will include uniform and/or compatibl~JPfQJect <br />identification monuments, business signage, street and other traffic diredior.ll:lfd,9Vi.Ces <br />conforming to the Tract's traffic control plan and deed restrictions. <br /> <br />5.4 Ownership and Maintenance. Ownership of the landscape buffers, reserves <br />and easements will be held by fee ownership of adjoining property or by the Property <br />Owners Association (POA), subject to conditions of the deed restrictions and landscape <br />plan. The maintenance 'of the buffers, reserves and easements will be the <br />responsibility of the contiguous property owners pursuant to provisions of the deed <br />restrictions, enforced by the POA. <br /> <br />The Op~n Space/Pedestrian Trail System shall be constructed within or adjacent to the <br />drainage easement and detention pond/drainage system as dictated by the final <br />detention 'design. Ownership and maintenance of the Open Space/Pedestrian Trail <br />System and drainage/detention pond system shall be detemlined according to Article <br />5.1 of this Agreement: <br /> <br />ARTICLE VI. SCHEDULE <br /> <br />6.1 Schedule. The Owner-Developer shall establish a specific schedule for the <br />development of and construction improvements on the Tract with the end user(s). <br />However: in lieu of and as the basis of that detailed schedule, the following work <br />program is anticipated: <br /> <br />. Initiation of complete engineering study, including drainage and preliminary <br />infrastructure design. <br />. Detailed engineering desig':l for Phase One, being all or substantial part of area <br />identified herein as Section One. This would include rail connection to main line and <br /> <br />T1EP 2002 Development Agreement-Final.doc <br /> <br />Page 40f9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.