Laserfiche WebLink
M Mundo La Porte • • <br />May 15, 2003 <br />Page 3 of 4 <br />The City prepared a long-term sanitary sewer master plan for providing <br />sewer service to unserved areas of southeast LaPorte. The plan calls for <br />a lift station to be placed at the southwest corner of McCabe Road and <br />Taylor Bayou (A 104-00-00). As the area develops, the City plans to <br />construct a sanitary sewer system for this area. This will require the <br />developer to dedicate land at McCabe and Taylor Bayou. Once the <br />system is operational, the developers temporary lift station shall be <br />abolished. <br />• Drainage — This property lies within the Taylor Bayou Watershed. <br />There are not sufficient channel improvements to directly receive storm <br />water runoff from this project. However, the plan shows that storm <br />water will be managed using a 4-acre detention -basin system. <br />• Zoning — Currently, of 28 acres needed to develop this project, only 16 <br />are zoned PUD; the balance is R-1. Multi -family development is allowed <br />in the PUD but is not allowed in R 1. The developer must seek a rezone <br />to PUD or R 3 to develop multi -family units on these 12 acres. <br />Multi -family regulation — Recently the Commission and City Council <br />adopted new multi -family development regulations. The regulations <br />established new requirements for open spacefrecreation and amenities, <br />maintenance, spacing requirements of multi -family developments for <br />each other, _ 180 unit maximum, 14 units per acre density, and <br />ingresslegress. When development in the PUD district occurs, the <br />Commission is allowed to follow the regulations of the district the <br />development could be built; however, the PUD allows for some <br />flexibility and creativity. Therefore, strict adherence to the <br />aforementioned requirements is not necessary. <br />Recommendation: Based on items discussed under Analysis, Staff requests further directions <br />from the Commission Additional information and details need to be <br />discussed with the owner/developer. These items/conditions are listed below: <br />1. The owner/developer must receive a rezone to PUD or R 3 on 12 <br />acres currently zoned R 1. This would result in the project having 28 <br />acres that could be developed as multi -family instead of only 16 <br />acres. <br />2. The overall density of the project shall not exceed 16 dwelling <br />units per acre. <br />3. The applicant must adhere to the terms and regulations provided <br />for multi -family development except for the following: units per <br />acre, 180-unit limit, and 1000' spacing requirement. <br />