My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-19-2003 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
2000's
>
2003
>
06-19-2003 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:34 AM
Creation date
7/31/2025 11:29:17 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
6/19/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />• <br />Tsble 3.4 <br />PROTECTION REQUIREMENTS AT <br />WATER LINE -FORCE MAIN CROSSINGS <br /> PROPOSED WATER <br />PRIMARY PROPOSED WATER PROPOSED FORCE MAIN <br />CONDITION EXISTING FORCE MAIN ~ OR <br /> EXISTING WATER <br /> PROPOSED FORCE MAIN <br />SECONDARY WATER OVER WATER UNDER WATER OVER WATER UNDER <br />CONDITIONS FORCE MAIN FORCE MAIN FORCE MAIN FORCE MAIN <br /> Less Greater Less Greater Less Greater Less Greater <br />1F THE than 2' than 2' than 2' than 2' than 2' than 2' than 2' than 2' <br />CLEARANCE IS ~ but less but less but less but less <br /> than 10' than 10' than 10' than 10' <br />*Protection 1 2 . 3 4a or 4b 5 6a 3 6a & 6b <br />R ent <br />*PROTECTION REOU)REMENTS FOR FORCE MAIN CROSSINGS <br />(All clearances shall be measured from outside wall to outside wall) <br />1. Construct waterline with a 20-foot steel section with all related appurtenances centered above the <br />force main; 6-inch minimum clearance. <br />2. Construct water line with one 20 foot joint of C-900, C-905 PVC centered above the force main. <br />3. Not allowed <br />4. a Auger, bore & jack or microtunne! 10 feet minimum each side of force main. Place <br />one 20-foot joint of C-900 or C90S, 1 SO psi, centered under sanitary sewer. Fill bore <br />hole with bentonite%lay mixture or grout; 2 foot minimum clearance. <br />b. OR replace the existing force main with ISO psi lined ductile iron pipe with appropriate <br />adapters on all portions of the force main within 10 feet of the water line. <br />S. Center a minimum 18 foot joint of force main, ISO psi lined ductile iron pipe under water line and <br />use cement-stabilized sand bac~ll for all portions of the force main with 10 feet of the water line <br />as measured perpendicularly from arty point on the water pipe to the wastewater pipe (minimum <br />2.5 sacks cement per cubic yard of sand). The cement-stabilized sand bedding shall start at a <br />point 6 inches below the bottom of the sanitary sewer to 6 inches above the top of the sanitary <br />sewer and one quarter of the pipe diameter on either side of the force main. <br />6. ~ Minimum 18 foot of sanitary sewer force main, 1 SO psi lined ductile iron pipe centered at the <br />water line. <br />3. Sanitary Sewer Manholes: Provide a minimum 10 foot horizontal clearance from <br />outside wall of existing or proposed manholes, make manholes and connecting <br />sewers watertight and test for leakage. If a 10 foot clearance caimot be obtained, <br />the water line may be located closer to the manhole when prior approval has <br />been obtained from the Planning Department by using one of the procedures <br />below; however, in no case shall the clearance be less than 4 feet. <br />a. Water line may be encased in a carrier pipe. ~ Encasement shall be steel <br />water line in a steel carrier pipe. <br />b. The water line may be augured, bore &jacked, or microtunneled past <br />the manhole with at least one 20 foot section of C-900 PVC pipe, 150 <br />psi, installed centered about the existing sanitary manhole with .pressure <br />grouting using a bentonite%lay mixture or other commercial grouts. <br />Water System Design Criteria Page 11 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.