My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-19-2003 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
2000's
>
2003
>
06-19-2003 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:34 AM
Creation date
7/31/2025 11:29:17 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
6/19/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c <br /> <br />• <br />3.03 QUALITY ASSURANCE <br />A. Prepare calculations and drawings under the supervision of a Professional Engineer <br />trained and licensed under the disciplines required by the nature of the drawings. The <br />final design drawings, must be sealed, signed and dated by the Professional Engineer <br />responsible for development of the drawings. <br />B. .For Elevated Stream and Ditch Crossings: Prepare design calculations for support <br />columns and column spacing. <br />3.04 EXTRA:fERRITORIAL JURISDICTION <br />A. The criteria herein described in this section shall be applicable to all water main and <br />appurtenance construction and all devices thereunto appertaining within the ETJ of the <br />City of La Porte except where specifically denied thereto or where specific exemptions <br />for the ETJ have been enumerated. <br />Water System Design Criteria Page 12 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.