Laserfiche WebLink
Port of Houston Authority • • <br />Major Development Site Plan <br />Page 3 of 5 <br />The Council action authorizes the applicant to submit a Major <br />Development Site Plan for the Commission's consideration & approval. <br />Analysis: In addition to performance standards, there are a number of development <br />standards that are specified by the Zoning Ordinance. These standards are <br />applicable to all P.U.D. developments. Section 106-659 of the Code of <br />Ordinances establishes the following criteria for review of the development <br />projects within a P.U.D. zoning district: <br />Uses — The City's Comprehensive Plan shows this area developing with <br />industrial uses. The existing land uses of nearby properties are primarily <br />industrial (the Port Authority's main facility); however, there are single- <br />family residences south of the undeveloped "E" Street right-of-way. <br />In general, high intensity uses should be adjacent to each other. When higher <br />uses abut residential uses buffering must occur to protect the health, safety, <br />and general welfare of neighborhoods. As a part of the Port's site plan, they <br />have incorporated landscaping and a masonry wall to protect the adjacent <br />residential from the activities of the proposed pre -check facility. In addition, <br />the undeveloped North "E Street" right-of-way will remain in tact. <br />Streets - Being located along Barbour's Cut Boulevard, a primary arterial <br />road with 100' right-of-way, and major truck route, provides more than <br />adequate accessibility for circulation of truck traffic. There should be very <br />limited impact on traffic flow within the vicinity even after full <br />implementation of the proposed project. <br />The private drives and truck parking areas shall be designed and constructed <br />in conformance with the City's Standards Specs. Since trucking movement is <br />the primary function of the facility, access management and circulation <br />should be the top priority while developing the project. Driveways <br />connecting directly onto the roadway should be minimized to avoid traffic <br />congestion and other delays caused by turning movements for the eighteen - <br />wheelers entering and exiting the facility. Wide turning radius and traffic <br />signage are suggested for flow of traffic. In addition, the pre -check facility <br />will lessen the amount of time trucks spend idling on Barbour's Cut Blvd. <br />Topography — This area is relatively flat and stable and should not be an <br />obstacle to this type of development. <br />Utilities and Drainage - There is a sufficient water distribution facility in <br />the area to supply potable and fire protection to this proposed development. <br />Public facilities and services are sufficient to handle the needs of the said <br />project. In addition, provisions will have to be made to ensure that sufficient <br />utility extensions are made to serve this development. <br />