My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-19-2004 Regular Meeting, Public Hearing, and Workshop Meeting of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
2000's
>
2004
>
08-19-2004 Regular Meeting, Public Hearing, and Workshop Meeting of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 3:12:37 PM
Creation date
7/31/2025 11:29:39 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
8/19/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Seville Place Apts. - Preliminary t <br />9/16/04 — P-& Z Meeting <br />Page 3 of 4 . <br />Utilities There are sufficient- water and sewer facilities in the vicinity to <br />provide service to this proposed. development. The developer is responsible <br />for providing all_ on -site infrastructure or improvements to .accommodate the <br />subdivision's water and sanitary sewer needs. The design and construction of <br />all. water and : sewer systems shall be. in - conformance with the City's <br />approved.Public Improvement Criteria Manual (PICM). <br />Drainage The proposed subdivision is • designed so : that all storm <br />drainage - flows directly into the detention pond. outfall. to - the adjacent <br />-HCFCD 'facility. -:The Harris . County Flood Control .District's approval <br />shall be required in this regard: The° pond's size and- capacity will be <br />reviewed at the construction drawings to ensure that it`can adequately <br />serve the •proposed -development without burdening the existing system: <br />'.The developer shall provide all :the necessary easements required for <br />• . - proper drainage, including storm water inlets. - <br />Conclusion and <br />Recommendation:— - � The Preliminary Plat is ' in 'accordance 'with . the . City.'s development <br />regulations: Staff recommends approval of - the Preliminary Plat with. the - - _ <br />- following conditions: <br />=- `=�Eoristnictioii drawings shall kiridicate all infrastructure and site drainage - - ' <br />.::... <br />mprovements to'ensure ad equate'capacity'and proper. site drainage.. -- _ <br />.. _ Sf... -� A iltro�J. • `_iM..i y.p:'pF..w <br />Devetopeis=rsporisilil'e ;for installation of sidewalks along both sides of _- <br />- - <br />all right=of--ways witfiin the complex; along east side of:. ells Blvd., and' <br />j' °'southof Veritue''Larie toward's`tlie end of the subdivision line. <br />•. Developer must secure. a maintenance bond; according to the -City's <br />multi -family provisions., or. seek an . approved :alternate 'showing' <br />"evidence of :bonding insurance 'or participate .in a "reserve fund <br />mechanism''. •that establishes: an account for the .:sole purpose of <br />maintenance to the project. This. fund is for. the lifetime of the project. <br />• Detention pond ownership and maintenance•by the HOA shall be stated <br />on the .final plat. <br />Options available to the Commission are as. follows: <br />• Approval of the Preliminary Plat -authorizes the developer to submit a <br />Final Plat. <br />• Conditional. approval of the Preliminary Plat requires' submission of an <br />amended Preliminary Plat and additional documentation as specified by <br />C] <br />
The URL can be used to link to this page
Your browser does not support the video tag.