My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-17-2005 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
2000's
>
2005
>
11-17-2005 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 2:57:02 PM
Creation date
7/31/2025 11:29:59 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
11/17/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Preserve at Taylor Bayou — FinPlat • <br />12/15HO5 — P & Z Meeting <br />Page 2 of 4 <br />• Land Use — Review of the City's Land Use Plan indicates this 107- <br />acre area was envisioned as developing as low density residential with <br />a small corner for commercial uses. The significant portion of this <br />proposed development is considered low -density residential. A 78.652 <br />acre tract will be dedicated as a nature preserve or conservation <br />easement, serving as a buffer between the proposed development and <br />surrounding properties. <br />• Multi -Family Regulations — As required by multi -family regulations <br />adopted by the City on October 14, 2002, the multi -family development <br />is located at least 1,000 ft. from other multi -family residential <br />developments of 20 or more units. In addition, the proposed development <br />does not exceed 180 dwelling units, the limit established by City <br />Ordinance. <br />• Transportation/Interior Circulation — The developer is proposing two <br />points of entrance/exit off McCabe Road. These common access drives <br />will serve the entire development and Nature Preserve. The complex will <br />have primary access on McCabe Road (I00'ROW), which may <br />accommodate the traffic generated by this development. A traffic <br />analysis study was submitted for this development, including the nature <br />preserve and commercial tract. <br />• Sidewalks — As per Section 5.02 of the Development Ordinance, the <br />Commission required pedestrian sidewalks. The developer shall be <br />responsible for construction and installation of sidewalks within the <br />complex. In addition, the developer shall construct sidewalks along <br />McCabe Road right-of-way up to the end of the subdivision line near SH <br />146. <br />• Trail Master Plan — This project does not affect the implementation <br />plan. <br />• Parks and Recreation — Section 12.0 of the City's Development <br />Ordinance requires the developer to provide on -site open space and <br />recreational space or to remit fees in lieu of parkland to the City. Per the <br />Ordinance, an area of land dedicated to the City for parkland purposes <br />shall equal one acre for each 160 proposed single-family dwelling units. <br />Therefore, a monetary fee in lieu of parkland would be required at or <br />prior to the time of final plat approval. <br />• Utilities — There are sufficient water distribution facilities along McCabe <br />Road to supply potable water and fire protection to the proposed project. <br />Provisions need to be made to ensure that sufficient utility extensions are <br />constructed to serve this development. Sanitary sewer service is not <br />readily available to this site, and must be coordinated with the <br />development to the north, "Lakes at Fairmont Greens." The design and <br />construction of all water and sewer systems shall be in conformance with <br />the City's approved Public Improvement Criteria Manual (PICM). <br />
The URL can be used to link to this page
Your browser does not support the video tag.