Laserfiche WebLink
<br />Port Crossing <br />Final Plat <br />Page 4 of 4 <br /> <br />Recommendation: <br /> <br />system/drainage channel construction and maintenance will be the sole <br />responsibility of the developer and Property Owner's Association. <br /> <br />The Final Plat is in accordance with the City's development regulations. <br />Staff recommends approval of the Final Plat. The following items need to be <br />addressed prior to the recordation of the Plat: <br /> <br />· All construction improvements are complete at site. <br /> <br />· Final construction drawings (as built) shall be submitted to the City for <br />acceptance. <br /> <br />· Furnish approval letter from the Exxon/Mobil for utility construction and <br />pipeline overlapping into the right-of-way. <br /> <br />Options available to the Commission are as follows: <br /> <br />· Approval of the Final Plat withholding signature and recordation until <br />the above are complied. This will authorize the developer to begin <br />construction of the subdivision improvements. <br /> <br />· Disapproval of the Final Plat and supporting documents as filed. This <br />will require the developer to file a new Final Plat with the required <br />documents. <br />