efforts to estimate the contractor's production time for a project essentially consisting of <br />20 small separate replacement areas is not going to be as good as the contractor <br />performing this work regularly.) <br />February 21, 2013 — Initial advertisement for bid is published. In 2-1/2 weeks, Planning and <br />Engineering staff designed and prepared contract documents that the county engineering_ <br />consultant's proposed $70,000 fee to design. <br />March 12, 2013 --- Construction bids opened. Initial project cost was $525,742.02, not including <br />contingency. <br />March 20, 2013 — Access to final county construction drawings forwarded to staff. <br />March 25, 2013 - Staff advised of the environmental permit language concerning the city <br />asbestos concrete water main and the potential for other conflicts with county plan <br />revisions made after the 95% -plan submittal. Discussions with apparent low bidder to <br />incorporate these changes into the scope of work resulted in proposal for Change Order <br />No. 1, resulting in an additional $67,770 in utility work, <br />Action Required by Council: <br />Council may: <br />1. Consider rejecting all bids for Sealed Bid #13012 — Farrington Boulevard Utility Relocate <br />and re -bid the project; or <br />2. Consider approval or other action authorizing the City Manager to enter into a contract with <br />Paskey, Incorporated in the amount of $525,742.02, accepting the Alternate Bid, and <br />further allocating up to $578,316.22 for this contract including a $52,574.20 contingency <br />(10.0%). The $578,316.22 contract will be funded from the Utility Fund reserve reducing <br />the working capital to just over 60 -days; or <br />3. Direct staff to pursue any other option desired by the City Council. <br />Anuroved for City Council Agenda <br />Corby D. Alexander, City Manager <br />Date <br />