My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2013-3476 amending Fiscal 2012-2013 budget
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2010's
>
2013
>
O-2013-3476 amending Fiscal 2012-2013 budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2019 3:23:38 PM
Creation date
4/23/2013 12:04:21 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
4/22/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pro'ect Benefits Liabilities and Operating Cost: <br />Benefits: <br />• Harris County Pct 2 proposes to upgrade their storm drainage facilities and concrete road <br />surface along Farrington Boulevard. The improved storm sewer system will greatly <br />reduce the potential for overland flooding into residential structures in portions of <br />Fairmont Park Sections One and Two. The current roadway condition is poor and <br />requires reconstruction. <br />Liabilities of Maintaining the Status Quo: <br />• The city utilities are located within Harris County right-of-way and some of these <br />existing facilities must be relocated in order to allow Harris County to construct the <br />proposed storm and roadway improvements that will benefit motorists and the local <br />residents. <br />Operating Costs: <br />• The majority of the relocation work involves the existing water main crossovers. These <br />mains are 50 -years old and have required repair on numerous occasions over the past <br />several years. Replacing the mains will eliminate need for emergency repairs on those <br />replaced segments likely for several decades. <br />Proiect Timeline: <br />September 2012 — City first notified that the Farrington Road Improvement Project was moving <br />forward. At this time Harris County was going to include city utility relocates with the <br />county project with no city financial participation required (100% grant funded). <br />December 6, 2012 — Staff advised by Harris County that the available grant funding was not <br />sufficient to fund the city utility relocates. The city would be responsible. The city was <br />provided a 30% design plan set that did not yet include the project storm sewer. City_ <br />staff did not have sufficient information to begin desig_n., <br />January 17, 2013 -- Staff receives a list of potential conflicts between city facilities and the <br />proposed new county facilities. Staff replies back with comments designed to reduce the <br />number of conflicts. Staff did not yet have sufficient information to begin design. The <br />county design was still changing at that point. <br />February 1, 2013 - Staff receives 95% drawings from the Harris County consultant. <br />February 4, 2013 — Staff receives the electronic drawings from Harris County necessary for <br />design. Cit staff can now begin design. Initial cost estimate was $400,000 based on <br />scope of work outlined in the 95% plans. (This is $125,742 below the apparent low bid. <br />Staff identified two additional sanitary sewer conflicts which accounts for nearly half of <br />this difference at approximately $60,000. Also staff closely compared the bid received to <br />the Engineer's Estimate and concluded that the difference between the bid prices and the <br />Engineer's Estimate was due to the complexity of the project. There were no recent <br />projects similar to this one for staff to use as a guide in estimating the costs. Staff's <br />
The URL can be used to link to this page
Your browser does not support the video tag.