My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-30-15 Drainage and Flooding Committee Meeting minutes
LaPorte
>
City Meetings
>
Minutes
>
Drainage and Flooding Committee
>
2015
>
03-30-15 Drainage and Flooding Committee Meeting minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
7/15/2015 7:33:37 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
3/30/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> F216 Phase II —Watershed Improvements (W. Madison St. to 450' South of W. Main St.) <br /> City Engineer/Inspection Services Manager Bob Eng provided an update on the F216 Phase II — <br /> Watershed Improvements (W. Madison St. to 450' South of W. Main St.). <br /> Vice-Chairman Martin asked the timeline for completion of the project. Mr. Eng responded he does <br /> not have a completion date and will have to advise the Committee at a later date. <br /> N. P Street Culvert Replacement Project <br /> City Engineer/Inspection Service Manager Bob Eng provided an update on the N. P Street Culvert <br /> Replacement Project. Alternate Member Earp asked how long it will take to provide the 20' <br /> maintenance easement on the east side of the existing ditch as per the request of Harris County <br /> Flood Control District. Mr. Eng responded a purchase order has been received recently and it will <br /> be done within the next two weeks. <br /> N. D Street to Sens Road Ditch De-Silting Project <br /> City Engineer/Inspection Service Manager Bob Eng provided an update on the N. D Street to Sens <br /> Road Ditch De-Silting project. There were no questions from Committee Members. <br /> Browning/Golden Drainage Improvements Project <br /> City Engineer/Inspection Service Manager Bob Eng provided an update on the Browning/Golden <br /> Drainage Improvements Project. Committee Member Leonard asked after re-grading the ditch and <br /> replacing culverts to facilitate drainage to N. P Street are there any foreseeable downstream or <br /> flooding problems with additional water flow in the area. Mr. Eng responded he does not anticipate <br /> any issues. <br /> D Street Ultimate Outfall Project <br /> City Engineer/inspection Service Manager Bob Eng provided an update on the D Street Ultimate <br /> Outfall Project. Committee Member Martin asked if there are any plans for the empty acreage <br /> surrounding the project. Planning and Development Director Tim Tietjens responded the City has <br /> plans to partner with Trees for Houston and plant trees along the D Street ditch. <br /> TX Dot/Broadway Remote Maintenance Contract <br /> City Engineer/Inspection Service Manager Bob Eng provided an update on the TX Dot/Broadway <br /> Remote Maintenance Contract. Committee Member Martin asked if the culverts will be replaced. <br /> Mr. Eng responded yes. Committee Member Martin requested staff to investigate the process of <br /> filling the ditch from Pine Bluff south to Bayside Dr., and report back to the Committee. <br /> CLP Bulkhead <br /> City Engineer/Inspection Service Manager Bob Eng provided an update on the CLP Bulkhead at <br /> Happy Harbor. Committee Member Martin asked the total length of the waterfront property. <br /> Planning and Development Director Tim Tietjens responded roughly 300 or more feet not including <br /> Klein Retreat or any other property south. <br /> Page 2 of 4 <br /> March 30, 2015 <br /> Drainage and Flooding Committee Minutes <br />
The URL can be used to link to this page
Your browser does not support the video tag.