Laserfiche WebLink
<br />Director Of Works <br />Page 2 <br /> <br />. <br /> <br />. <br /> <br />sure of 2950 lbs. The anticipated operating pressure will be <br />approximately 800 lbs., with a maximum camnodity temperature of 85 <br />degrees, fahrenheit. <br /> <br />I . am also enclosing Amoco's draft 112046, in the amomt of $300.00, in <br />payment of the initial permit fee for these crossings. <br /> <br />If any further information is ra;Iuired, or, there are any questions, I <br />can be reached at the above address, where nw teleptone number is <br />817/878-6143. We anticip:lte construction to begin on this project the <br />first week of July, with all construction complete, and the line opera- <br />tional by October 1, 1987. <br /> <br />Very truly yours, <br /> <br /> <br />JARljr <br /> <br />Enclosures <br /> <br />-\. <br />