Laserfiche WebLink
<br />" <br /> <br />ExxonMobil Pipeline compa. <br />... 800 Bell Street <br />Houston, Texas 77002.7426 <br />Post Office Box 2220 <br />Houston, Texas 77252.2220 <br /> <br />stet McDaniel <br />Manager <br />Right-of-Way and Claims <br /> <br />EJf(onMobil <br />Pipeline <br /> <br />February 26,2001 <br /> <br />City of La P~eplacement Crossing <br />Fairmont Pa-rr~~y <br />Bay town-Pierce Jct., rlw-34 <br />Harris County, Texas <br /> <br />City Secretary, City of La Porte <br />Attention: Steve Gillett <br />P.O. Box 1115 <br />La Porte, Texas 77572-1'115 <br /> <br />..... <br /> <br />Dear Mr. Gillett: <br /> <br />ExxonMobil Pipeline Company (EMPCo) owns and operates a 10" Refined Products <br />Pipeline which crosses through the city of La Porte as shown on the attached vicinity <br />plat. This pipeline was installed by Humble Oil and Refining Company in the 1940's and <br />was assigned to EMPCo in 1965. EMPCo's existing permit covering these locations is <br />dated July 13, 1942 and is with Harris County. <br /> <br />As a part of our maintenance practices we have conducted a recent pipeline survey on <br />the 10" pipeline and have determined that the Fairmont Parkway Pipeline Crossing <br />needs to be replaced with a new crossing. This new crossing will be located within our <br />existing right-of-way at Fairmont Parkway. <br /> <br />It is my understanding from our recent conversations that the City of La Porte has a city <br />ordinance that requires pipeline companies to apply for a permit if a new or replacement <br />pipeline is to be installed across or along or under any public place, i.e., street, R1W, <br />park, etc. Therefore I am, by evidence of this letter, submitting the required information, <br />drawings and fees associated with the permit ordinance process and EMPCo is formally <br />requesting that the City of La Porte issue EMPCo a permit to replace its existing pipeline <br />crossing referenced hereinabove with a new pipeline crossing to be located with in our <br />existing right-of-ways. EMPCo plans on beginning the work as soon as the City of La <br />Porte and Harris County complete their permit process. <br /> <br />Fairmont Parkway (Key May 578-H)) will be bored and the depth, location & length of <br />the crossing is detailed on the attached plan and profile drawing for Fairmont Parkway. <br />Once the crossing is complete EMPCo will complete the necessary work to tie-in the <br />new pipeline crossing to the existing pipeline then abandoned the old crossing by <br />removing the old pipeline and filling the existing casing with cement. <br />An ExxonMobil Subsidiary <br />