Laserfiche WebLink
<br />r' <br /> <br />" <br /> <br />. . <br /> <br />. . <br /> <br />e <br /> <br />e <br /> <br />City Secretary <br />City of La Porte <br />January 4,2001 <br />Page 3 of4 <br /> <br />cover; and all permitted ditches from the Harris County Flood Control District (HCFCD) will <br />pass 5 feet below the HCFCD's ultimate design. All street crossings will be conventionally <br />bored. The Union Pacific Railroad crossing, HCFCD Ditch A104-07-00, Big Island Slough <br />(HCFCD Ditch B 1 06-00-00) and HCFCD Ditch B 1 09-00-00 will be directionally drilled or <br />guided pilot bored. <br /> <br />BP Amoco proposes to start construction in late 1st Quarter or early 2nd Quarter, 2001. <br />Construction time is estimated at seventy-two (72) working days with completion and <br />demobilization in June, 2001. <br /> <br />The abandoned 18" pipeline will be emptied by displacing the line fill with nitrogen, after which <br />the pipeline will be pumped full of concrete and abandoned in place. There will be <br />approximately nine (9) miles of abandoned pipeline in the Union Pacific Railroad right-of-way. <br /> <br />A check in the amount of $500.00 is enclosed for the permit fee of $300.00 and the first year <br />annual fee of $200.00. Copies of permit drawings for the Union Pacific Railroad and Harris <br />County Flood Control District are included for those crossings located in the City of La Porte. <br /> <br />It is hoped this application will meet with the City of La Porte's City Council approval. If <br />additional information is required, please contact: <br /> <br />Mr. Ron Whaley, Project Manager <br />Universal Ensco, Inc., <br />1811 Bering, <br />Houston, Texas 77057 <br /> <br />Phone: 713-977-7770 ext. 1226 <br />