My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-11-16 Martin L. King Splash Park
>
City Secretary
>
Agenda packets 2010 to current
>
Public Works
>
Martin L. King Splash Park
>
04-11-16 Martin L. King Splash Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 11:42:05 AM
Creation date
3/7/2025 1:34:04 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Contracts/Leases/Agreements
Date
4/11/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br />Ala <br />i" cilit:ies Ltd <br />q cari�(Ortlt Company <br />TURNKEY QUOTATION <br />PROJECT NAME: MARTIN L. KING SPLASH PARK <br />OWNER: CITY OF LA PORTE, TEXAS <br />DATE: 2/29/2016 <br />Restroom Facilities Limited (RFL), the Nation's leading specialized restroom design/build firm <br />since 1988, offers to furnish and install, per plans and specifications, subject to our attached <br />Scope of Work, and the Standard Terms and Conditions of Sale, which become part of our offer <br />to sell. <br />BUYBOARD CONTRACT 423.13 <br />RFL BASE MODEL #AB212DF @ $ 65,265.30 <br />INSTALL @ $ 9,000.00 <br />TOTAL WITH BUYBOARD DISCOUNT @ $ 74,265.30 <br />FREIGHT, CRANE, BOND @ $ 8,923.00 <br />TOTAL BUYBOARD W/ FREIGHT AND CRANE @ $ 83,188.30 <br />Note: You must itemize your purchasing document as shown in this quote. <br />Payment terms: 50% installment with order; 40% in progress billings during construction; and <br />balance of 10% upon completion of delivery and installation, no retention. Payment of 90% <br />must be received by RFL prior to scheduling of delivery and installation. Thank you for <br />considering RFL as your restroom specialist for this project. <br />HOW WE WORK <br />If you are the apparent low just simply send us a letter of intent and we will begin the <br />construction drawings. Once plans have been approved and engineer stamped, the <br />manufacturing process begins. Typically, the construction time frame is approximately 90-120 <br />days and begins with execution of sales order and receipt of approved submittals, color <br />selections and progress payments. In -plant inspection reports and certifications will be provided <br />by an independent inspection agency. The client must prepare the site in accordance with the <br />"Scope of Work by Client" attached and coordinate any required on site inspections. After the <br />site prep has been completed, our crew arrives to perform the installation. They will verify <br />elevation, offsets, location, and access. <br />Exclusions: <br />A. Sidewalks beyond building slab. <br />Initial Initial Page 1 of 8 <br />1707 Colt Circle, Marble Falls, Texas 78654 0 Phone: 512.222,5454 0 www.restroomfacilities.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.