My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1998-2267
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1998
>
O-1998-2267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:01 PM
Creation date
7/25/2006 4:17:07 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
7/27/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />.... ....... J e."". <br />~ . <br /> <br />1.1.3 Agreement Extensions <br /> <br />.' ~; : : P 1 <br /> <br />Phonoscope will offer separately to provide a service and maintenance agreement to extend I <br />maintenance beyond the tenn of this Statement of Work. <br /> <br />; ~ . <br /> <br />1.1.4 Grant of Right <br /> <br />. ,. :-" <br /> <br />'.0' <br />. IBM grants the District the exclusive right to use the fiber network for the provision of <br />connectivity service. IBM agrees to not grant permission to use this fiber network to any other <br />party for the duration of the contract with the District. <br /> <br />. I' ~. .' <br /> <br />1.1.5 Ownership of Fiber Network <br /> <br />. I i <br /> <br />The fiber optic network shall remain the property of Phonoscope regardless of whether installed <br />. within or upon the buildings and whether installed overhead, above, or underground and shall not <br />be considered a fixture or an addition to the land or the buildings located thereon. ":. I <br /> <br />Any cabling, hardware, software and tenninal equipment purchased by the Distri~t outside of this <br />Statement of Work are and remain the property of the District. . I' : ' <br /> <br />1.1.6 Subsequent Changes to the Fiber Network <br /> <br />The District has the option to connect additional electronic equipment to the fiber optic network <br />as the District deems appropriate with no additional cost for the use of the fiber installed in this <br />Statement of Work. ' <br /> <br />Phonoscope will retain ownership of the fiber optic cable and the tenninating patch panels. <br /> <br />Within the four (4) year tenn of this Statement of Work, a future school site has been included in <br />the network and will be installed at a date and location to be detennined by the District at no " <br />additional charge to the District, provided that such future school site is within a one-mile radius <br />of the fiber backbone, situated between Baker Junior High and the Business Office as illustrated <br />in the attached Exhibit A. The maximum fiber count shall be twelve (12) count single-mode ", <br />fiber. . . <br /> <br />1.2 Key Assumptions <br /> <br />.\ I! <br /> <br />This Statement of Work and IBM's estimates to perfonn the Statement of Work are based on the <br />following key assumptions. Deviations that arise during the proposed project will be managed <br />through the procedure described in Appendix B, "Project Change Control PrOcedure".' ., ' <br /> <br />. f. ,I,: .', <br /> <br />1.2.1 General <br /> <br />IBM Global Services &: La Pone ISO <br /> <br />peA 0 I September 30. 1998 <br /> <br />Poge S or 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.