My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2000-2425
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2000
>
O-2000-2425
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:05 PM
Creation date
7/27/2006 10:21:19 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
8/14/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />Mr. Douglas K. Kneupper, P.E. <br />City of La Porte <br />June 5,2000 <br />Page 4 <br /> <br />EXTRA SERVICES <br /> <br />a. Field surveying <br /> <br />b. Geotechnical investigation <br /> <br />c. Changes to the work requested by the City <br /> <br />d. Record drawings - Prepare and deliver to City a set of reproducible <br />record drawings showing those change made during the construction <br />period based upon change orders, marked up prints, drawings and other <br />data furnished by the contractor to the engineer and which engineer <br />deems significant. <br /> <br />COMPENSATION <br /> <br />Wayne Smith and Associates, Inc. proposes the compensation for the preliminary, <br />design, bidding and construction phases be based upon percentage of construction costs as <br />follows: <br /> <br />BASIC SERVICES <br /> <br />Estimated. Construction Cost = $1,400,000,00 <br />Total Basic Service Fee @ 7.8% = $109,200.00 <br /> <br />Preliminary Phase (25% ofTota!) <br />Design Phase (55% of Total) <br />Bidding Phase (5% ofTota!) <br />Construction Phase (15% ofTota!) <br /> <br />$ 27,300.00 <br />60,060.00 <br />5,460.00 <br />16,380.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.