Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />Mr. Douglas K. Kneupper, P.E. <br />City of La Porte <br />June 5,2000 <br />Page 4 <br /> <br />EXTRA SERVICES <br /> <br />a. Field surveying <br /> <br />b. Geotechnical investigation <br /> <br />c. Changes to the work requested by the City <br /> <br />d. Record drawings - Prepare and deliver to City a set of reproducible <br />record drawings showing those change made during the construction <br />period based upon change orders, marked up prints, drawings and other <br />data furnished by the contractor to the engineer and which engineer <br />deems significant. <br /> <br />COMPENSATION <br /> <br />Wayne Smith and Associates, Inc. proposes the compensation for the preliminary, <br />design, bidding and construction phases be based upon percentage of construction costs as <br />follows: <br /> <br />BASIC SERVICES <br /> <br />Estimated. Construction Cost = $1,400,000,00 <br />Total Basic Service Fee @ 7.8% = $109,200.00 <br /> <br />Preliminary Phase (25% ofTota!) <br />Design Phase (55% of Total) <br />Bidding Phase (5% ofTota!) <br />Construction Phase (15% ofTota!) <br /> <br />$ 27,300.00 <br />60,060.00 <br />5,460.00 <br />16,380.00 <br />