<br />. e <br />III. SCHEDULE <br /> <br />The Engineer is ready, willing and able to start work <br />immediately upon receipt of a signed contract with the City on <br />this project. Anticipated schedule of completion of each phase <br />is as outlined below, based on working days. <br /> <br />A. Preliminary Engineering Phase <br />1. Field Surveys <br /> <br />3 days <br /> <br />2. Preparation of Preliminary <br />design, plan, and documents <br /> <br />10 days <br /> <br />ESTIMATED TIME <br /> <br />13 days <br /> <br />B. Final Design Phase <br /> <br />1. Final Field Surveys <br /> <br />1 day <br /> <br />2. Preparation of Preliminary <br />Contract Documents, etc. <br /> <br />20 days <br /> <br />3. Preparation of Final <br />Contract Documents <br /> <br />4 days <br /> <br />ESTIMATED TIME <br /> <br />25 days <br /> <br />C. Construction Phase <br /> <br />1. Contract Administration <br /> <br />10 days <br />10 days <br />48 days <br /> <br />ESTIMATED TIME <br />TOTAL ESTIMATED TIME <br /> <br />IV. COMPENSATION <br /> <br />A. Preliminary Engineering Phase: <br /> <br />Engineering fee based on per diem rates and man hours <br />expended on the project estimated at $ 5,200.00 . <br /> <br />B. Design Phase: <br /> <br />Engineering fee based on per diem rates and man hours <br />expended on the project estimated at $ 6,400.00 . <br /> <br />Page 5 of 19 <br />