My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1990-11-12 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1990's
>
1990
>
1990-11-12 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:02 PM
Creation date
3/21/2025 1:46:26 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
11/12/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~) <br />.y <br />CLAUN CH & MI LER, IN C. <br />Engineering Consultants <br />November 1, 1990 <br />Mr. Bill Manning <br />City Engineer <br />City of La Porte <br />604 W. Fairmont Parkway <br />P. 0. Box 1115 <br />La Porte, Texas 77572-1115 <br />Re: Construction Administration Services for the City of La Porte's <br />Fire Training Facility <br />Dear Mr. Manning: <br />Claunch & Miller, Inc. (CMI) is pleased to submit this proposal for <br />providing construction administration services for the Fire Training <br />Facility (FTF) Project. <br />SCOPE OF SERVICES <br />1. General - It is understood that the City of La Porte desires CMI to <br />provide normal construction administration duties associated with the <br />Fire Training Facility (FTF) Project. The project was designed by an <br />engineering firm not associated with CMI. The project is presently at <br />a stage where design is complete. It is understood and agreed upon <br />that CMI's implementation of normal construction administration duties <br />in no way implies or places the responsibility for the adequacy of the <br />engineering design upon CMI. <br />It. is also understood that the design firm may not be available during <br />the construction phase of this project and CMI may be called upon for <br />recommendations as to interpretation of the plans and documents and as <br />to alternative methods and materials. Such recommendations and <br />interpretations will be performed as an assistance to and in <br />coordination with the City of La Porte. <br />CMI will be performing these duties in conjunction with its <br />construction observation and management services as outlined in it's <br />contract scope of services dated June 8, 1990. Within that contract, <br />there are references to CMI's coordination with the design firm in <br />anticipation that the design firm for the FTF would be providing the <br />construction administration services. Since the design firm will not <br />be providing construction administration services and if the design <br />firm is not available for this coordination, CMI will perform said <br />coordination with the City of La Porte. <br />3701 Kirby Drive, Suite 892 • Houston, Texas 77098 • (713) 524-7113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.