My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-03-09 Drainage and Flooding Committee minutes
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
2009
>
06-03-09 Drainage and Flooding Committee minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
3/21/2025 2:28:11 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
6/3/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SECTION 3 <br />FAIRMONT PARK EAST COST ESTIMATE & CONCLUSION <br /> <br />All the alternatives investigated involve removing the existing 60-inch CMP outfall pipe <br />and replaced with a larger capacity reinforced concrete box (RCB) outfall, headwall, and <br />wing walls. Alternatives I, 2A, 3 and 4 propose an 8'x 6' RCB and Alternative 2B <br />proposes a 9'x 6' RCB to provide needed capacity. <br /> <br />Alternatives described in this report increase peak flows over existing conditions at the <br />outfall; therefore, HCFCD may require mitigation of these increases in peak flows <br />downstream that will have significant impacts to cost estimates. Construction estimates <br />described herein do not include mitigation options or costs. <br /> <br />3.1 Alternative 1 Add Parallel Trunk Line to Existing Storm Sewer with Pavement <br />Repair for One Travel Lane to Sycamore Dr. North <br /> <br />Alternative I is the addition of a parallel storm sewer trunk line under the northbound <br />travel lane of Fleetwood Drive and tied into the existing 60-inch RCP under the pavement <br />of Fleetwood Drive and Mesquite. A junction box will be needed for joining the existing <br />pipe with the proposed. The limits of the parallel trunk line are from the outfall to North <br />Sycamore and include connection of the 24-inch pipe between North of N. Sycamore to <br />the new trunk. <br /> <br />This configuration has a design capacity of 225.5 (cfs) for a 5-year event at the outfall <br />and keeps the HGL below Fleetwood Drive until North Spruce where approximately 6- <br />inches of ponding may result. <br /> <br />3-1 <br /> <br />Klotz Associates Project No. 0127.009.000 <br />May 2009 <br /> <br />Fairmont Park East & Brookglen Drainage Study <br />City of La Porte <br />
The URL can be used to link to this page
Your browser does not support the video tag.